
18th Edition Part 6 Mock 3
Authored by Gareth Wyatt
Other
Professional Development
Used 2+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
Verification of voltage drop where required shall meet the requirements of chapter?
2.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
Where RCD's are required for additional protection, the effectiveness of the RCD shall be verified by suitable test equipment to?
3.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
If all of the following tests listed in a) to d) are required in a new electrical installation, which of the listed tests must be performed first before the installation is energised?
4.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
A commercial premise has changed ownership, and the nature of the business, hence a periodic inspection and test is required. The reason periodic inspection and testing is performed is; so far as is reasonably practicable?
5.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
A new installation is to be installed with a circuit that utilises a transformer. The protection method on the load side is by electrical separation, what must be done to confirm the separation of the live parts from other circuits?
6.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
Which one of the following options is not the purpose of periodic inspection and testing?
7.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
After a new electrical installation has been installed in a property, the installation shall be inspected and tested to verify that the requirements of the Regulations have been me. The verification shall be made by?
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Microsoft
or continue with
%20(1).png)
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?