Integrative Strategies | LEED Green Associate

Integrative Strategies | LEED Green Associate

Professional Development

36 Qs

quiz-placeholder

Similar activities

Bldg Laws & Professional Practice of Architecture

Bldg Laws & Professional Practice of Architecture

University - Professional Development

40 Qs

Friday Quiz (April 29)

Friday Quiz (April 29)

Professional Development

32 Qs

The Great Architectural History Quiz

The Great Architectural History Quiz

Professional Development

37 Qs

URBAN DESIGN 3: ALE 2022

URBAN DESIGN 3: ALE 2022

Professional Development

35 Qs

HOA-2

HOA-2

University - Professional Development

35 Qs

Bars Compre

Bars Compre

Professional Development

40 Qs

Integrative Strategies | BD+C

Integrative Strategies | BD+C

Professional Development

41 Qs

Professional Practice: General

Professional Practice: General

Professional Development

32 Qs

Integrative Strategies | LEED Green Associate

Integrative Strategies | LEED Green Associate

Assessment

Quiz

Architecture

Professional Development

Hard

Created by

Tony Vannoy

Used 2+ times

FREE Resource

36 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

A LEED NC Project is pursuing Credit Integrative Process. As part of discovery phase of energy related research, which of the following elements should the team not include?

Local climate

Site conditions

Potential building features

Local Rainfall data

Answer explanation

As part of the discovery phase for energy related systems. Projects should collect information about the local climate, site conditions, energy sources, transportation options, and potential building features.

2.

MULTIPLE SELECT QUESTION

1 min • 1 pt

Reducing external light pollution will result in synergies between what LEED Credit Categories? (Choose 2)

Energy and Atmosphere

Sustainable Sites

Indoor Environmental Quality

Innovation

Answer explanation

Energy and Atmosphere: Reducing light pollution with impact energy usage, though the light pollution credit is not part of Energy and Atmosphere.

 

Sustainable Sites: Light pollution reduction is covered in the Sustainable Sites category. Light pollution impacts night-time views and nocturnal life. Projects attempting this credit are required to meet the lighting power densities defined in ASHRAE 90.1-2010 based on the zone of the project.

 

 

The other choices are:

 

Indoor Environmental Quality

Innovation

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which of the following factors is a fundamental evaluation criterion for the prerequisite Integrative Project Planning and Design?

Sensitive Land

Human health

Strategies that have bigger impact on project energy usage

Cost-effective adoption of green design and construction strategies

Answer explanation

The intent of integrative project planning and design prerequisite is to maximize opportunities for integrated, cost-effective adoption of green design and construction strategies, emphasizing human health as a fundamental evaluative criterion for building design, construction and operational strategies.

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Reducing the heat island effect by installing paving materials with a high SRI can have an impact on credits in what LEED Categories? (Choose 2)

Indoor Environmental Quality

Sustainable Sites

Materials and Resources

Water Efficiency

Energy and Atmosphere

Answer explanation

 

Sustainable Sites: Reducing heat islands is a credit from the Sustainable Sites category.

 

The other choices are:

 

Water Efficiency: Paving materials with a high SRI would not impact any of the Water Efficiency credits.

 

Indoor Environmental Quality: Paving materials with a high SRI would not impact any of the IEQ credits.

 

Materials and Resources: Paving materials with a high SRI would not impact any of the Materials and Resources credits. If the materials were Regional Materials they could but that information was not provided in the question so you can’t assume one way or the other.

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

A project in Phoenix, Arizona is required to conduct a four hour integrated design charrette to optimize the integration of green strategies. Which of the following rating systems suits for the project?

LEED BD+C: New Construction

LEED BD+C: Healthcare

LEED BD+C: Homes

LEED BD+C: Schools

Answer explanation

Healthcare Projects are required to conduct a four hour design charrette in order to meet the requirements of the Prerequisite Integrative Project Planning and Design.

6.

MULTIPLE SELECT QUESTION

1 min • 1 pt

Designing a building with a natural ventilation system will impact what credit categories? (Choose 2)

Indoor Environmental Quality

Energy and Atmosphere

Sustainable Sites

Materials and Resources

Answer explanation

Energy and Atmosphere: A natural ventilation system (aka passive ventilation) will reduce the energy demands of a building. No mechanical cooling system will need to installed and run.

Indoor Environmental Quality: A natural ventilation system impacts the indoor air quality of a building. Indoor air quality is part of this credit category.

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The project team is identifying at least one on-site, non-potable water source that could be used to offset water demand. Which of the following credits are they working on?

We Credit Indoor Water Use Reduction

WE Prerequisite Outdoor Water Use Reduction

Integrative Process

WE Prerequisite Indoor Water Use Reduction

Answer explanation

 

Integrative Process For IP credit, discovery requires assessing and estimating potential non-potable water supply sources. Projects should demonstrate how at least one non-potable water supply source was used to offset at least two water demand components (indoor, outdoor, process).

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?