CCGT House Load

CCGT House Load

1st - 12th Grade

•

31 Qs

quiz-placeholder

Similar activities

Fermented Dough Products: Introduction

Fermented Dough Products: Introduction

1st Grade

•

26 Qs

SAFETY IN THE HOME

SAFETY IN THE HOME

8th Grade

•

30 Qs

PMKR: Engine diesel

PMKR: Engine diesel

11th Grade

•

31 Qs

Révision: Circuit résidentiel 1

Révision: Circuit résidentiel 1

1st - 10th Grade

•

26 Qs

Automotive Electrical Fundamentals

Automotive Electrical Fundamentals

9th - 12th Grade

•

34 Qs

PRODUK CAKE DAN KUE INDONESIA

PRODUK CAKE DAN KUE INDONESIA

2nd Grade

•

36 Qs

Chapter 10 Developing Muscle Fitness

Chapter 10 Developing Muscle Fitness

11th - 12th Grade

•

31 Qs

PAS KPPDP KELAS XI APHP 1 dan 2

PAS KPPDP KELAS XI APHP 1 dan 2

11th Grade

•

30 Qs

CCGT House Load

CCGT House Load

Assessment

Quiz

•

Professional Development

•

1st - 12th Grade

•

Practice Problem

•

Medium

Created by

Spectacular Indonesia

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

31 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

House Load dapat dilakukan jika

CB 52G Open

DS 41E Open

CB 52L1 Open

CB 52L1L2 Open

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Pada saat Unit beroperasi normal, Berapa jumlah HRSG FWP yang beroperasi?

1 FWP

2 FWP

3 FWP

Redundant

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Pada Normal Operasi, Berapa Jumlah CEP yang inservice?

Hanya 1 CEP

2 CEP bekerja bersamaan

Tidak beroperasi

Disupport HRSG FWP

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Salah satu penyebab 2 buah HRSG FWP inservice adalah

2 CEP Inservice

Load Naik

Duct Burner Inservice

Steam Drain Valve Open

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Salah satu penyebab fenomena Swelling di steam drum adalah ?

Kenaikan Level steam drum

unit Load Turun

Unit Load Naik Cepat

House Load

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Kapan Fenomena swelling dan shringking dapat terjadi

Runback

Unit start up

Load rejection

Part load

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Swelling dan shrinking dapat diatasi dengan mengontrol Level di drum dengan cara

1 Element control

3 element control

2 element control

Control level

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development