PD 1096

PD 1096

University

40 Qs

quiz-placeholder

Similar activities

Etika rekayasa

Etika rekayasa

University

35 Qs

Anatomy Review

Anatomy Review

University

40 Qs

Cardiovascular System and ECG

Cardiovascular System and ECG

University

43 Qs

TOEFL Structure (Post test)

TOEFL Structure (Post test)

9th Grade - Professional Development

40 Qs

Ujian Masuk

Ujian Masuk

7th Grade - University

40 Qs

Airplane Flying Hand book part 1

Airplane Flying Hand book part 1

KG - Professional Development

43 Qs

Siemens Level 1 PLC #1

Siemens Level 1 PLC #1

University - Professional Development

39 Qs

AWS Cloud Practitioner

AWS Cloud Practitioner

University - Professional Development

41 Qs

PD 1096

PD 1096

Assessment

Quiz

Professional Development

University

Practice Problem

Medium

Created by

Jennie

Used 219+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Mr. Manny Pacquiao has a new plans of his Mansion in Gen. Santos City. He needs to obtain a building permit, he is the owner of the lot. he must file all the necessary forms, together with accomplished application forms, the following shall be submitted to the OBO, except. (nbc, sec 302 - 2A)

Contract of Lease, or Deed of Absolute Sale

Certited true copy of OCT/TCT, on, file with the Registry of deeds

Tax declaration

Current Real Property tax receipt

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The OBO inspector found out that the site of Mr. Manny Pacquiao had some Unauthorized change, modification or alteration during construction in the duly submitted plans and specifications on which the building permit is based. What will be the violation and fines? (nbc, sec 212)

No violation, Because he is a Senator of Rep. of the Philippines.

Less grave violation = 8,000 pesos

Light violation = 5,000pesos

Grave violation = 10,000 pesos

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The second floor slab was designed to resist fire for two (2) hours, as per NBCP rule VI. What is the minimum overall thickness of slab and cover to reinforcement of the said slab? (nbc, sec 603)

150mm overall; 30mm concrete cover

100mm overall; 15mm concrete cover

120mm overall; 25mm concrete cover

125mm overall; 20mm concrete cover

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This shall be issued by the building official within 30 days if after final inspection and submittal of a certificate of completion; it is found that the building/structure complies with the provisions of the NBCP. (nbc, sec 309)

technical transfer certificate

Certificate of completion

Certificate of occupancy

Birth certificate

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

PD 1096: Width and Height of doors will be not less than ___ mm in width, not less than ___ m in height, opening will be 90 degrees and exit way clear width not less than 700mm? (sec. 1207-3c)

900, 2.10

900, 2.00

800, 2.00

800, 2.10

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If arcaded bldg, no chaflan required notwithstanding the width of public street, less than ___ m? (sec 1008-3)

3.60

4.00

2.40

1.80

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Spacing of rows of seats from back to back - not less than mm(standard seating) (sec. 1207 - 13a)

840mm

850mm

860mm

900mm

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?