DAY 36 FTC Specialized Course PSDM Ice Breaker

DAY 36 FTC Specialized Course PSDM Ice Breaker

Professional Development

7 Qs

quiz-placeholder

Similar activities

Module 7745 Chapter F

Module 7745 Chapter F

Professional Development

6 Qs

DC MOTOR

DC MOTOR

Professional Development

10 Qs

Module 7745 Chapter G

Module 7745 Chapter G

Professional Development

7 Qs

AC Drive Characteristics 1

AC Drive Characteristics 1

9th Grade - Professional Development

10 Qs

electricity

electricity

KG - Professional Development

9 Qs

Physics Fun Energy Dhamaal

Physics Fun Energy Dhamaal

7th Grade - Professional Development

10 Qs

FFS Bagging Machine  - Operation

FFS Bagging Machine - Operation

Professional Development

10 Qs

SYNCHRONOUS MOTOR

SYNCHRONOUS MOTOR

Professional Development

10 Qs

DAY 36 FTC Specialized Course PSDM Ice Breaker

DAY 36 FTC Specialized Course PSDM Ice Breaker

Assessment

Quiz

Physics

Professional Development

Medium

Created by

G M

Used 1+ times

FREE Resource

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

2 TRUTHS AND A LIE

|FIND THE LIE!!!|

The PANTOGRAPH is mounted on the roof of an electric rolling stock to collect power through the OCS.

The PANTOGRAPH collects power from OCS and directs it to the Traction Motor.

The PANTOGRAPH may operate in either direction of travel of the train.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The device which takes electrical energy is known as the electrical load. It consumes electrical energy in the form of the current and transforms it into other forms like heat, light, work, etc.

The loads can be the following except:

Resistive Load

Inductive Load

Capacitive Load

Alternative Load

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The __________________ is used to supply the electricity that is sent out from the railway substation to the rolling stock and other essential loads inside the rolling stock including the lighting system, ventilating system, among others.

Rectifier Substation

Overhead Catenary System (OCS)

Power Distribution Diagram

Power Line Distribution System

4.

FILL IN THE BLANK QUESTION

30 sec • 1 pt

Media Image

The ____________ is a self-propelling train unit capable of coupling with other units of the same or similar type and still being controlled from one cab and is powered by electricity from an external source.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

An electrical equipment is considered ENERGIZED when the following are present/occurring EXCEPT:

Circuit is closed or connected

Electricity flows in continuous current

Creates potential for electrical shock

Circuit is opened or disconnected

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The following are activities related to the conduct of maintenance and inspection of contact line facilities (OCS) EXCEPT:

Conduct insulation resistance

Conduct panto-up, panto-down exercises

Conduct inspection on cable, its connection, etc

Check if installation parameters are met

7.

OPEN ENDED QUESTION

1 min • 1 pt

Media Image

How can you contribute in the attainment of a safe environment during the conduct of practical exercises at the railway operator's facility?

Evaluate responses using AI:

OFF