Search Header Logo

BUILDING LAWS QUIZ 1

Authored by Kate Casper

Architecture

Professional Development

Used 4+ times

BUILDING LAWS QUIZ 1
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Any physical change made on a building/structure to increase its value, utility and/or to improve its aesthetic quality.

a.    Alteration

b.    Renovation

b.    Renovation

c.    Addition

d. Modification

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

    According to the National Building Code, what is the maximum cost of a traditional family dwelling?

a.    PHP10,000

b.    PHP15,000

c.    PHP20,000

d.    PHP25,000

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

     Which of the following requires a building permit?

a. Garden pools 500mm deep or shallower

b. Repairs of doors, floors, windows, or fences

c. Repairs of load-bearing partition walls

d. An open terrace 15sqm in area

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.            This person is tasked with the enforcement of the National Building Code in his or her jurisdiction. He/she issues, denies, suspends, or revokes building permits.

a.    The Secretary of the DPWH

b.    The Building Official

c.    The construction inspector

d.    The barangay captain

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following are exempt from fees?

a.    Public buildings

b.    Single family dwellings made of native materials, costing PHP15,000 or less

c.    Hospitals

d.    Both A and B

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

    According to the Building Code, how many sets of plans and specifications must be submitted when applying for a permit?

a.    3 sets

b.    5 sets

c.    6 sets

7 sets

a.    3 sets

b.    5 sets

c.    6 sets

d. 7 sets

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to Article 1723 of the Civil Code, who shall be held liable if a building collapses due to defects in the plans?

a.    The architect or the engineer who drew up the plans

b.    The contractor and the construction supervisor

c.    The Building Official who reviewed and approved the plans

d.    Both A and B

a.    The architect or the engineer who drew up the plans

b.    The contractor and the construction supervisor

c.    The Building Official who reviewed and approved the plans

d.    Both A and B

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?