Windows

Windows

10th - 12th Grade

20 Qs

quiz-placeholder

Similar activities

"3MC" 46 Kto to jest kapłan katolicki?

"3MC" 46 Kto to jest kapłan katolicki?

6th - 12th Grade

15 Qs

Piaget Review

Piaget Review

10th - 12th Grade

15 Qs

10. Kötésmódok, csapágyak, tengelykapcsolók

10. Kötésmódok, csapágyak, tengelykapcsolók

9th - 10th Grade

15 Qs

UCSP 2

UCSP 2

11th Grade

20 Qs

Evaluación Laboratorio de Investigación

Evaluación Laboratorio de Investigación

9th Grade - University

20 Qs

1KGT H1.5 woordenlijst

1KGT H1.5 woordenlijst

1st - 12th Grade

15 Qs

PARAGRAF DENEME 11

PARAGRAF DENEME 11

11th - 12th Grade

20 Qs

Películas CDE

Películas CDE

KG - Professional Development

17 Qs

Windows

Windows

Assessment

Quiz

Other

10th - 12th Grade

Medium

Created by

Dale O'Banner

Used 27+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Installing windows and exterior doors in a house is the final step in _____.

finishing

thermal protection

drying-in

envelope sealing

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

For maximum energy efficiency in a structure, air infiltration is controlled by properly applying and sealing

_____.

building paper

polypropylene film

rigid insulation

building wrap

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When installing building wrap on a structure, all overlaps should be _____.

3" to 6"

6" to 12"

12" to 18"

18" to 24"

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

To meet IRC requirements, the maximum sill height above the floor of an egress window is _____.

36"

40"

44"

48"

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Nailing flanges are not found on the outside of _____.

wood windows

metal windows

vinyl-clad wood windows

vinyl windows

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When checking a window opening for squareness, you would use a _____.

combination square

plumb bob

framing square

laser level

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

To allow for settling, the space allowed between the rough header and window head jamb should be _____.

1/8" to 1/4"

1/4" to 1/2"

5/16" to 5/8"

5/8" to 3/4"

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?