1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Work sampling is applied for

Estimation of the percentage utilization of machine tools

Estimating the percentage of the time consumed by various job activities

Finding out time standards, specially where the job is not repetitive and where time study by stop watch method is not possible

All of the above

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Basic tool in work study is

Graph paper

Process chart

Planning chart

Stop watch

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The unit cost in case of batch production is __________as compared to jobbing production.

Same

Low

High

None of These

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For a product layout the material handling equipment must

Have full flexibility

Employ conveyor belts, trucks, tractors etc.

Be a general purpose type

Be designed as special purpose for a particular application

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is independent of sales forecast?

Productivity

Inventory control

Production planning

Production control

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following layouts is suited for mass production?

Process layout

Product layout

Fixed position layout

Plant Layout

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Performance rating is equal to

Observed performance + normal performance

Observed performance - normal performance

Observed performance × normal performance

None of the above