25 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Work sampling is applied for
Estimation of the percentage utilization of machine tools
Estimating the percentage of the time consumed by various job activities
Finding out time standards, specially where the job is not repetitive and where time study by stop watch method is not possible
All of the above
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Basic tool in work study is
Graph paper
Process chart
Planning chart
Stop watch
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The unit cost in case of batch production is __________as compared to jobbing production.
Same
Low
High
None of These
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
For a product layout the material handling equipment must
Have full flexibility
Employ conveyor belts, trucks, tractors etc.
Be a general purpose type
Be designed as special purpose for a particular application
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is independent of sales forecast?
Productivity
Inventory control
Production planning
Production control
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following layouts is suited for mass production?
Process layout
Product layout
Fixed position layout
Plant Layout
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Performance rating is equal to
Observed performance + normal performance
Observed performance - normal performance
Observed performance × normal performance
None of the above
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?