Which of the implementation sequence is used to check whether the result obtained from the PLC system is accurate ?
Task analysis
Commissioning
Hardware configuration
Software configuration
2.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
If the Pushbutton is Normally open (NO) we use
Make contact
Break contact
switch contact
3.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
If the Pushbutton is Normally Closed (NC) we use
Make contact
Break contact
switch contact
4.
MULTIPLE CHOICE QUESTION
1 min • 5 pts
The figure has an output Q1 connected back in parallel with the input I1 , this concept is called as
latching
commissioning
task analysis
software configuration
5.
MULTIPLE CHOICE QUESTION
1 min • 5 pts
In which step of the implementation sequence, the input and output variables are defined
task analysis
software configuration
hardware configuration
commisioning
6.
MULTIPLE CHOICE QUESTION
1 min • 5 pts
In Hardware interlock, What does A1 and A2 stand for ?
coil terminals
Open contacts
close contacts
common contacts
7.
MULTIPLE CHOICE QUESTION
1 min • 5 pts
In Hardware interlock, What does 1 and 3 stand for ?
coil terminals
Open contacts
close contacts
common contacts
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?