Which of the implementation sequence is used to check whether the result obtained from the PLC system is accurate ?

Task analysis

Commissioning

Hardware configuration

Software configuration

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

If the Pushbutton is Normally open (NO) we use

Make contact

Break contact

switch contact

3.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

If the Pushbutton is Normally Closed (NC) we use

Make contact

Break contact

switch contact

4.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

Media Image

The figure has an output Q1 connected back in parallel with the input I1 , this concept is called as

latching

commissioning

task analysis

software configuration

5.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

In which step of the implementation sequence, the input and output variables are defined

task analysis

software configuration

hardware configuration

commisioning

6.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

Media Image

In Hardware interlock, What does A1 and A2 stand for ?

coil terminals

Open contacts

close contacts

common contacts

7.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

Media Image

In Hardware interlock, What does 1 and 3 stand for ?

coil terminals

Open contacts

close contacts

common contacts

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?