Professional Development

32 Qs

quiz-placeholder

Similar activities

RA. 9514 - FIRE CODE

RA. 9514 - FIRE CODE

Professional Development

30 Qs

Friday Quiz (April 29)

Friday Quiz (April 29)

Professional Development

32 Qs

Monday Quiz (Mar. 07)

Monday Quiz (Mar. 07)

Professional Development

30 Qs

Cha Quiz

Cha Quiz

Professional Development

30 Qs

Random 2

Random 2

Professional Development

30 Qs

Standard Codes

Standard Codes

Professional Development

30 Qs

Materials of Construction [Quiz No. 2]

Materials of Construction [Quiz No. 2]

Professional Development

35 Qs

Thursday Quiz (April 7)

Thursday Quiz (April 7)

Professional Development

30 Qs

Professional Practice: General

Professional Practice: General

Assessment

Quiz

Architecture

Professional Development

Medium

Created by

Brian Tapispisan

Used 51+ times

FREE Resource

32 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Forecasting the performance of the project over time by gathering and analyzing primary data

Site Analysis

Pre-Feasibility Studies

Feasibility Studies

Architectural Research

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Formulation of site criteria

Site Analysis

Pre-Feasibility Studies

Feasibility Studies

Architectural Research

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

type of contract for architectural design services

includes the architectural design and the normal basic engineering

DAEDS

DADS

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

the client considers other engineering design firms with separate contracts

DAEDS

DADS

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Can be based on cost per square meter (sqm) of the project area

Lump Sum/ Fixed Fee

Percentage Based on Project Construction Cost

Unit Cost

Time Basis

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Scope of services can be clearly and fully defined at the outset of the project

Lump Sum/ Fixed Fee

Percentage Based on Project Construction Cost

Unit Cost

Time Basis

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Charged on a mutually-agreed hourly (man-hours) or daily (per diem) or per month rate

Lump Sum/ Fixed Fee

Percentage Based on Project Construction Cost

Unit Cost

Time Basis

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?