Professional Practice: General
Authored by Brian Tapispisan
Architecture
Professional Development
Used 53+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
32 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Forecasting the performance of the project over time by gathering and analyzing primary data
Site Analysis
Pre-Feasibility Studies
Feasibility Studies
Architectural Research
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Formulation of site criteria
Site Analysis
Pre-Feasibility Studies
Feasibility Studies
Architectural Research
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
type of contract for architectural design services
includes the architectural design and the normal basic engineering
DAEDS
DADS
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
the client considers other engineering design firms with separate contracts
DAEDS
DADS
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Can be based on cost per square meter (sqm) of the project area
Lump Sum/ Fixed Fee
Percentage Based on Project Construction Cost
Unit Cost
Time Basis
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Scope of services can be clearly and fully defined at the outset of the project
Lump Sum/ Fixed Fee
Percentage Based on Project Construction Cost
Unit Cost
Time Basis
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Charged on a mutually-agreed hourly (man-hours) or daily (per diem) or per month rate
Lump Sum/ Fixed Fee
Percentage Based on Project Construction Cost
Unit Cost
Time Basis
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?