CEA Final Exam Review

CEA Final Exam Review

11th - 12th Grade

34 Qs

quiz-placeholder

Similar activities

Marketing

Marketing

12th Grade

29 Qs

A short play vocabulary

A short play vocabulary

10th - 12th Grade

29 Qs

AP Bio: Natural Selection

AP Bio: Natural Selection

10th - 12th Grade

35 Qs

Latihan Soal PH BAB 1A

Latihan Soal PH BAB 1A

10th - 11th Grade

31 Qs

Enviro Sci Review 2

Enviro Sci Review 2

KG - University

35 Qs

Aprovisionamiento y material de oficina

Aprovisionamiento y material de oficina

11th Grade

30 Qs

The TREASURE Effect Quiz

The TREASURE Effect Quiz

4th Grade - Professional Development

35 Qs

BAHASA INGGRIS GANJIL X RANI 2023

BAHASA INGGRIS GANJIL X RANI 2023

11th Grade

30 Qs

CEA Final Exam Review

CEA Final Exam Review

Assessment

Quiz

Other

11th - 12th Grade

Practice Problem

Medium

Created by

Claudia Cortez

Used 19+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

34 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The main purpose of foundations is to:___________(2.3.5)

a.Provide a level, stable surface to safely support a building

b.Transfer building loads to soil

c.Anchor the building from wind, flood, and seismic loads

d.All of the above

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the approximate frost depth in Noblesville, IN?

a.5 in

b.10 in

c.20 in

d.25 in

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Calculate the required concrete iIf the required total footage is 750 ft3. How many yards will be needed for concrete?

a.10 yd3

b.20 yd3

c.28.5 yd3

d.30 yd3

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Calculate the total cost of the concrete if the required total footage is 750 ft3. What will be the total cost of the concrete if concrete is $98/yd3  ?

a.$1,793.00

b.$2,793.00

c.$3,793.00

d.$4,793.00

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What will be a problem that will result from ordering too little concrete?

a.The entire pour will be completed at the same time. 

 b.An increase in  the time and cost of construction. 

c.Less cost of concrete

d.Less cost of labor

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Electricity is supplied to a building via a service drop that includes

a.Three wires

b.Two wires carry 120 volts of alternating current (AC) such that the voltages are opposite

c.One wire is neutral or ground (zero volts)

d.All of the above

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What distributes power to the building and is the main breaker that allows all power to be switched off?

a.Electrical power

b.main panel

c.electrical cables

d.None of the above

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?