Why do u perform hydro-testing on pipe systems?

Test strength of the welds

Test strength of the pipes

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why do u perform hydro-testing on pipe systems?

Fit-up tightness of pipe connections

Fit-up tightness of flange connections

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which hydrotesting equipment is used to introduce water into the system?

Inlet hose

High pressure hose

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which hydrotesting equipment is used to force the system pressure up to the level required for the test?

Testing pump

Pressure pump

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which hydrotesting equipment is used to measure the pressure in the system?

Pressure gauge

Measure gauge

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which hydrotesting equipment is used and fitted to prevent leakage between pump and system under test?

Low-pressure hose

High-pressure hose

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which hydrotesting equipment is used to seal each end of the system under test and allowing easy fit of the test valves/gauges?

Test blinds X 2

Spade blinds X 2

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?