Search Header Logo

LXR Unit 6 Module 6.7

Authored by Miles Miller

Other, Specialty, Moral Science

1st - 6th Grade

Used 49+ times

LXR Unit 6 Module 6.7
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

17 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why do u perform hydro-testing on pipe systems?

Test strength of the welds

Test strength of the pipes

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why do u perform hydro-testing on pipe systems?

Fit-up tightness of pipe connections

Fit-up tightness of flange connections

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which hydrotesting equipment is used to introduce water into the system?

Inlet hose

High pressure hose

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which hydrotesting equipment is used to force the system pressure up to the level required for the test?

Testing pump

Pressure pump

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which hydrotesting equipment is used to measure the pressure in the system?

Pressure gauge

Measure gauge

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which hydrotesting equipment is used and fitted to prevent leakage between pump and system under test?

Low-pressure hose

High-pressure hose

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which hydrotesting equipment is used to seal each end of the system under test and allowing easy fit of the test valves/gauges?

Test blinds X 2

Spade blinds X 2

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?