
SAFETY QUIZ: RISK ASSESSMENT AND MANAGEMENT SYSTEM

Quiz
•
Professional Development, Other
•
KG - University
•
Hard
Fkj 13
FREE Resource
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Risk Assessments are to be conducted for ________ activities in the RSN.
shore
shipboard
all
sports
2.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
How are hazards being systemically identify in the RSN?
Job Safety Analysis (JSA)
Failure Mode and Effect Analysis (FMEA)
5M Elements
Hazard and Operability Study (HAZOP)
3.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
As a guide, meetings, briefings, discussions and other office-based administrative activities are generally deemed to be of _____ risk and there is no requirement to maintain RA records for these activities.
low
moderate
negligible
high
4.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
The development of RAM should be conducted by at least _________ of sufficient seniority with the relevant of expertise, experience and knowledge, and who are able to appreciate the complexities and problems associated with the activity.
one Safety Officer
two personnel
three operators
four members team from NIS
5.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
The purpose of RCM is to control the hazards and eliminate or reduce the corresponding consequences. RCMs that remove the hazard at source are considered the most effective, and should always be preferred. This is also called "designing the risk away". Based on Diagram 1, fill in the blanks (a), (b) and (c).
(a) plan, (b) check, (c) act
(a) substitution, (b) isolation, (c) PPE
(a) do, (b) act, (c) plan
(a) encouragement, (b) education, (c) enforcement
6.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Choose the correct answers for the blanks in Table 2.
(a) Moderately High, (b) Unit Safety Officer (USO), (c) Unit CO
(a) High, (b) Flot/Sqn Comd, (c) Unit CO
(a) Dangerous, (b) Cluster Chief, (c) USO
(a) Moderately Dangerous, (b) Unit CO, (c) USO
7.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
The conduct of a thorough risk assessment for an activity that is of moderate risk and above, as part of planning for the activity, is known as initial RA. The _____________ will perform the initial RA
Supervising Officer
Safety Officer
Conducting Officer
Commanding Officer
Create a free account and access millions of resources
Similar Resources on Wayground
8 questions
Accident reporting and ill health (Health & Safety)

Quiz
•
9th - 12th Grade
10 questions
Missing persons

Quiz
•
KG
10 questions
Kuis Patien Safety 1

Quiz
•
Professional Development
10 questions
ISPS Code

Quiz
•
Professional Development
10 questions
Risk Management

Quiz
•
University - Professi...
10 questions
Safety Practices in Construction

Quiz
•
University
10 questions
Hairdressing Risk Assessment

Quiz
•
Professional Development
15 questions
Risk Management Policy Quiz

Quiz
•
Professional Development
Popular Resources on Wayground
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
10 questions
Nouns, nouns, nouns

Quiz
•
3rd Grade
10 questions
9/11 Experience and Reflections

Interactive video
•
10th - 12th Grade
25 questions
Multiplication Facts

Quiz
•
5th Grade
11 questions
All about me

Quiz
•
Professional Development
22 questions
Adding Integers

Quiz
•
6th Grade
15 questions
Subtracting Integers

Quiz
•
7th Grade
9 questions
Tips & Tricks

Lesson
•
6th - 8th Grade