SAFETY QUIZ: RISK ASSESSMENT AND MANAGEMENT SYSTEM

SAFETY QUIZ: RISK ASSESSMENT AND MANAGEMENT SYSTEM

KG - University

10 Qs

quiz-placeholder

Similar activities

Nail Care

Nail Care

1st - 3rd Grade

10 Qs

Chapter 11

Chapter 11

Professional Development

10 Qs

Organise Resources

Organise Resources

5th Grade

12 Qs

WJEC Construction job roles

WJEC Construction job roles

10th - 11th Grade

15 Qs

AC4.3 Food Safety Legislation

AC4.3 Food Safety Legislation

8th Grade

10 Qs

Bengkel JKKP, HIRARC, RA, Biosafety & Biosecurity 2023

Bengkel JKKP, HIRARC, RA, Biosafety & Biosecurity 2023

Professional Development

15 Qs

CEO HSE FORUM - QUIZ

CEO HSE FORUM - QUIZ

Professional Development

11 Qs

OSH - Module 1

OSH - Module 1

Professional Development

11 Qs

SAFETY QUIZ: RISK ASSESSMENT AND MANAGEMENT SYSTEM

SAFETY QUIZ: RISK ASSESSMENT AND MANAGEMENT SYSTEM

Assessment

Quiz

Professional Development, Other

KG - University

Hard

Created by

Fkj 13

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Risk Assessments are to be conducted for ________ activities in the RSN.

shore

shipboard

all

sports

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

How are hazards being systemically identify in the RSN?

Job Safety Analysis (JSA)

Failure Mode and Effect Analysis (FMEA)

5M Elements

Hazard and Operability Study (HAZOP)

3.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

As a guide, meetings, briefings, discussions and other office-based administrative activities are generally deemed to be of _____ risk and there is no requirement to maintain RA records for these activities.

low

moderate

negligible

high

4.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The development of RAM should be conducted by at least _________ of sufficient seniority with the relevant of expertise, experience and knowledge, and who are able to appreciate the complexities and problems associated with the activity.

one Safety Officer

two personnel

three operators

four members team from NIS

5.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Media Image

The purpose of RCM is to control the hazards and eliminate or reduce the corresponding consequences. RCMs that remove the hazard at source are considered the most effective, and should always be preferred. This is also called "designing the risk away". Based on Diagram 1, fill in the blanks (a), (b) and (c).

(a) plan, (b) check, (c) act

(a) substitution, (b) isolation, (c) PPE

(a) do, (b) act, (c) plan

(a) encouragement, (b) education, (c) enforcement

6.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Media Image

Choose the correct answers for the blanks in Table 2.

(a) Moderately High, (b) Unit Safety Officer (USO), (c) Unit CO

(a) High, (b) Flot/Sqn Comd, (c) Unit CO

(a) Dangerous, (b) Cluster Chief, (c) USO

(a) Moderately Dangerous, (b) Unit CO, (c) USO

7.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The conduct of a thorough risk assessment for an activity that is of moderate risk and above, as part of planning for the activity, is known as initial RA. The _____________ will perform the initial RA

Supervising Officer

Safety Officer

Conducting Officer

Commanding Officer

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?