1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A roofing tile which has the shape of an “S” laid on its side is a

Mission Tile

Pantile

French Tile

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

That part of the building foundation which forms the permanent retaining wall of the structure below grade is a

Foundation Course

Grade Beam

Foundation Wall

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Joint employed to reduce restraint by accommodating movement of masonry walls are known as

Cold Joints

Control Joints

Block-outs

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A system of framing a building in which the studs are continuous to roof supporting second floor joints is known as

Post and Beam

Western Framing

Balloon Framing

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Rough plaster finish obtained by flinging plaster on a wall with a hand operated machine is

Tryolean Finish

Trowel Finish

Broom Stripped Finish

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A principal member of the truss which extends from one end to the other primarily to resist bending is a

Web Member

Girt

Chord

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A protein: the chief nitrogenous ingredient in milk is

Casein

Tempera

Alabaster

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?