PROFESSIONAL PRACTICE 01

PROFESSIONAL PRACTICE 01

Professional Development

50 Qs

quiz-placeholder

Similar activities

POST TEST PKP 2019

POST TEST PKP 2019

Professional Development

45 Qs

NPA 1130 - unit 4

NPA 1130 - unit 4

Professional Development

50 Qs

Health and safety

Health and safety

Professional Development

50 Qs

FA - Interim Mock Ch-4 to Ch-6

FA - Interim Mock Ch-4 to Ch-6

Professional Development

49 Qs

Steam Properties

Steam Properties

University - Professional Development

50 Qs

Y50 THE NEW BLOCKBUSTER

Y50 THE NEW BLOCKBUSTER

Professional Development

50 Qs

Soal UP 2022

Soal UP 2022

Professional Development

52 Qs

Moody's Analytics- Exit Test

Moody's Analytics- Exit Test

Professional Development

50 Qs

PROFESSIONAL PRACTICE 01

PROFESSIONAL PRACTICE 01

Assessment

Quiz

Other

Professional Development

Practice Problem

Medium

Created by

Aryelle Sison

Used 67+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In Design Competition, how many representatives of an owner can be part of the Jury?

2

3

1

As many as possible

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When was “the 2010 Standards of Professional Practice” approved?

July 27, 2010

March 9, 2010

July 27, 2011

March 9, 2011

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In Design Build services with guaranteed maximum PCC, the project construction cost is guaranteed by the Architect not to exceed ____ of the estimated project construction cost.

5%

10%

15%

20%

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which activity is included in the Contract Document Phase of the Architect's Regular Design Services?

Prepares forms for contract letting and bidding

Assists Owner on documents for government approval

Assists the Owner in obtaining proposals from contractors

Checks samples, schedules and shop drawings

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

This shall be issued by the Owner to the Contractor following the execution of the Contract Agreement.

Contract Time

Notice to Proceed

Contract Sum Breakdown

Schedule of Completion

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following is a responsibility of the Architect in the Construction Phase of the Regular Design Services?

Makes periodic visits to the site

Makes exhaustive on-site supervision

Be held responsible for failure of contractor to carry out work

Prepares shop drawings

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

If portions of the buildings are erected at different periods of time, thus increasing the Architect's construction period and burden of services, the charges pertaining to services rendered shall be doubled. A suspension of construction for a period not exceeding ____ months shall not be covered by this provision.

3 months

4 months

6 months

12 months

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?