Carpentry ch 12

Carpentry ch 12

12th Grade

50 Qs

quiz-placeholder

Similar activities

Business Management Quiz

Business Management Quiz

5th - 12th Grade

45 Qs

FRONT OFFICE 1_LONG QUIZ 1

FRONT OFFICE 1_LONG QUIZ 1

12th Grade

50 Qs

haircutting final exam

haircutting final exam

10th - 12th Grade

49 Qs

HTML,CSS y PHP

HTML,CSS y PHP

10th Grade - University

50 Qs

Verifica 5A inf  - SIstemi e reti - novembre 2020

Verifica 5A inf - SIstemi e reti - novembre 2020

12th Grade

45 Qs

ICS II Vocab 2/4/25

ICS II Vocab 2/4/25

12th Grade

53 Qs

Ripasso sistemi quarta

Ripasso sistemi quarta

12th Grade

46 Qs

Business Tech Midterm

Business Tech Midterm

9th - 12th Grade

45 Qs

Carpentry ch 12

Carpentry ch 12

Assessment

Quiz

Instructional Technology

12th Grade

Practice Problem

Hard

Created by

debra mccarthy

Used 4+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The most common type of framing used in residential construction is:

ballon frame construction

platform frame construction

post and beam frame construction

firestop construction

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Platform frame construction is sometimes called the

Northern Frame

Southern Frame

Eastern frame

Western frame

3.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

A platform frame is easy to erect because

only one-story buildings are constructed with this type of frame

each platform may be constructed on the ground

at each level a flat surface is provided om which to work

fewer framing members are required

4.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Draft blocking is used to

Slow the spread of fire

serve as nailing for finish material

reduce drafts and improve insulation

all of the above

5.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

In platform frame construction, the wall are

assembled on the ground and lifted up to the floor level

assembled at the same time the floor is being built

assembled on the floor and then tilted up in place

not put up until the roof is finished

6.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

To reduce shrinkage in lumber

use only #2 pine

Use only framing lumber with proper moisture content

wrap the lumber in plastic before using

use only green lumber

7.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The type of construction where the wall studs and first-floor joists rest on the sill and the second-floor joist rest on a 1 x 4 ribbon is called ------- construction

flush

platform

long stud

ballon frame

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?