1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Surveying is defined as the art and science of determining angular and linear measurement to establish the form, extent and relative position of points, lines, and areas on or near the surface of earth or on other extra terrestrial bodies through........
Pure mathematics and the social science
Applied mathematics and the use of specialized equipment and techniques
Field observation and measurement done by the field survey party
Cartographic, geodetic, and photogrammetric methods
Principles of Algebra, geometry and trigonometry
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Plane surveying is a type of surveying in which the earth is consider to be flat surface. Distances and areas involved are limited extent and ....
the approximate shape of the earth is considered
the theoretical shape of the geoid is evaluated
the exact shape of the earth is disregarded
the spheroidal shape of the earth is considered
the shape of the earth is considered a geoid
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
An error is defined as the difference between the .....
true value and the measured value of a quantity
estimated value and the most probable value of a quantity
true value and the approximate value of a quantity
two measured values of the same quantity
most probable value and the true value
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
A line, known to be 150.000 meters long, is measured five times with a steel tape in the following order: 150.004, 149.998, 149.997, 150.005,and 149.996 meters, respectively. The more accurate of the five measurement is the
1st measurement
2nd measurement
3rd measurement
4th measurement
5th measurement
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Five separate measurements were made of a line and their degrees of precision computed as follows in the following order: 1/5000; 1/2500; 1/6500; 1/7000; 1/10000, respectively. The measurement which is of a higher degree of precision was the one done in the
1st trial
2nd trial
3 trial
4th trial
5th trial
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
An early surveing instrument having an A-frame with a plumb line suspended from its apex and was used to determine the horizontal is the
Diopter
Chorobates
Groma
Libella
Dioptra
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Notes must not be crowded, and mistakes and omissions must be kept
to a minimum.
Accuracy
Composition
Completeness
Clarity
Legibility
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?