P231 Sustainable Site Planning Process
Authored by Geomilie Tumamao-Guittap
Specialty, Professional Development
University - Professional Development
Used 28+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
45 sec • 5 pts
______________ is a holistic approach to creating environmentally sensitive development and mitigating environmental degradation.
Special planning, design, and management
Development-focused planning, design, and management
Sustainable planning, design, and management
Beautiful planning, design, and management
2.
MULTIPLE CHOICE QUESTION
45 sec • 5 pts
In the Site Planning Process, ________ defines the project’s objectives and functional requirements, including the proposed activities, area allocated for each activity, and the functional or spatial relationships among those activities
Site analysis
Site inventories
Site selection
Programming
3.
MULTIPLE CHOICE QUESTION
45 sec • 5 pts
In the Site Planning Process, ________ map important physical, biological, and social or cultural attributes. These may include circulation patterns and traffic volumes, existing utility systems, or architectural character within the surrounding built environment. Collectively, the features of the site and its surroundings, in conjunction with the project’s program, determine the attribute data that are collected for the site inventory.
Site analysis
Site inventories
Site selection
Programming
4.
MULTIPLE CHOICE QUESTION
45 sec • 5 pts
In the Site Planning Process, ________ summarizes the site’s suitability for the programmed uses. A variety of physical, biological, and cultural attributes can influence the site’s suitability for the project under consideration. Information contained in the site’s inventory maps can be synthesized to create one or more maps of the site’s suitability for development, generally, or its suitability for specific program objectives.
Site analysis
Site inventories
Site selection
Programming
5.
MULTIPLE CHOICE QUESTION
45 sec • 5 pts
During the Design & Implementation Phases, ________ is the process of adapting the program to the site, flows directly from the site analysis. Sustainable site design adapts the project’s program elements to the unique features of the site.
Design Development
Conceptual Design
Construction Documentation
Implementation Phase
6.
MULTIPLE CHOICE QUESTION
45 sec • 5 pts
During the Design & Implementation Phases, the ________ process refines or spatially articulates, these diagrammatic elements of the concept plan. Regardless of the project’s program, design development involves documenting— with plans, sections, elevations, and three-dimensional perspectives—how the plan’s components will appear and relate to one another functionally.
Design Development
Conceptual Design
Construction Documentation
Implementation Phase
7.
MULTIPLE CHOICE QUESTION
45 sec • 5 pts
During the Design & Implementation Phases, the ________ phase generates construction drawings (plans, elevations, sections, and details) together with the written construction specifications
Design Development
Conceptual Design
Construction Documentation
Implementation Phase
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?