Boiler Start Up & Shutdown

Boiler Start Up & Shutdown

University

13 Qs

quiz-placeholder

Similar activities

UFO Quiz

UFO Quiz

University

10 Qs

Iron Man

Iron Man

1st Grade - University

12 Qs

llamas

llamas

6th Grade - University

8 Qs

Alberta Natural Resources #2

Alberta Natural Resources #2

KG - University

12 Qs

General Assembly Icebreaker

General Assembly Icebreaker

University

10 Qs

Accounting 100

Accounting 100

University

13 Qs

17 course French classical menu 01

17 course French classical menu 01

University

10 Qs

BSHM65

BSHM65

University

10 Qs

Boiler Start Up & Shutdown

Boiler Start Up & Shutdown

Assessment

Quiz

Other

University

Practice Problem

Hard

Created by

Rehana Ali

Used 10+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

13 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The purpose of an internal boiler inspection is to ensure that the boiler is filled with scale, oil , debris and other foreign materials.

True

False

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

With respect to the start up preparation of a boiler, which of the following is not typically checked?

Distribution piping

Feedwater system

The Boiler itself

Fuel & Draft system

3.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

When new refractory has been installed in a boiler, the furnace has to be 'boiled out' before raising the furnace to normal operating conditions.

True

False

4.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Which of the following is NOT an area of major attention when starting up a boiler?

Obtaining stable ignition

Bringing boiler up to normal operating conditions

Preparing & pressurizing steam headers

Monitoring wastewater quality

5.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Which is the correct sequence of steps with respect to boiler ignition?

1. Furnace pre-purge 2. Reducing air flow

3. Main burner ignition

4. Pilot burner ignition

1. Reducing air flow

2. Furnace pre-purge

3. Pilot burner ignition

4. Main burner ignition

1. Reducing air flow

2. Furnace pre-purge

3. Main burner ignition

4. Pilot burner ignition

1. Furnace pre-purge

2. Reducing air flow

3. Pilot burner ignition

4. Main burner ignition

6.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

After ignition and during the warm up of a boiler, the firing rate is usually increased on automatic mode.

True

False

7.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Steam headers must be warmed up properly to prevent thermal stress and to produce condensate.

True

False

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?