Boiler Start Up & Shutdown

Boiler Start Up & Shutdown

University

13 Qs

quiz-placeholder

Similar activities

MODULE 7 QUIZ

MODULE 7 QUIZ

University

10 Qs

Chapter 14 - Boilers

Chapter 14 - Boilers

University

10 Qs

Thermal Engg. lab_Boiler

Thermal Engg. lab_Boiler

University

14 Qs

Kuis Sosialisasi Fuel Balance RU V

Kuis Sosialisasi Fuel Balance RU V

University

10 Qs

RVTI Review PDI Propane

RVTI Review PDI Propane

University

14 Qs

POP QUIZ Ch1

POP QUIZ Ch1

University

12 Qs

Minecraft Quiz

Minecraft Quiz

3rd Grade - University

10 Qs

Minecraft

Minecraft

KG - Professional Development

13 Qs

Boiler Start Up & Shutdown

Boiler Start Up & Shutdown

Assessment

Quiz

Other

University

Hard

Created by

Rehana Ali

Used 10+ times

FREE Resource

13 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The purpose of an internal boiler inspection is to ensure that the boiler is filled with scale, oil , debris and other foreign materials.

True

False

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

With respect to the start up preparation of a boiler, which of the following is not typically checked?

Distribution piping

Feedwater system

The Boiler itself

Fuel & Draft system

3.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

When new refractory has been installed in a boiler, the furnace has to be 'boiled out' before raising the furnace to normal operating conditions.

True

False

4.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Which of the following is NOT an area of major attention when starting up a boiler?

Obtaining stable ignition

Bringing boiler up to normal operating conditions

Preparing & pressurizing steam headers

Monitoring wastewater quality

5.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Which is the correct sequence of steps with respect to boiler ignition?

1. Furnace pre-purge 2. Reducing air flow

3. Main burner ignition

4. Pilot burner ignition

1. Reducing air flow

2. Furnace pre-purge

3. Pilot burner ignition

4. Main burner ignition

1. Reducing air flow

2. Furnace pre-purge

3. Main burner ignition

4. Pilot burner ignition

1. Furnace pre-purge

2. Reducing air flow

3. Pilot burner ignition

4. Main burner ignition

6.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

After ignition and during the warm up of a boiler, the firing rate is usually increased on automatic mode.

True

False

7.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Steam headers must be warmed up properly to prevent thermal stress and to produce condensate.

True

False

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?