Valve Repair

Valve Repair

Professional Development

20 Qs

quiz-placeholder

Similar activities

Engineering Technology 7 Aug 2019 - Choose The Correct Picture

Engineering Technology 7 Aug 2019 - Choose The Correct Picture

Professional Development

20 Qs

6035 Level 2 Drainage

6035 Level 2 Drainage

Professional Development

20 Qs

Requirements for System Types

Requirements for System Types

Professional Development

20 Qs

Wet System Components

Wet System Components

Professional Development

15 Qs

BASIC AUTOMOTIVE TECHNOLOGY & CAR QUIZ

BASIC AUTOMOTIVE TECHNOLOGY & CAR QUIZ

Professional Development

25 Qs

Phase 2 Exam prep 2

Phase 2 Exam prep 2

Professional Development

20 Qs

Helpers Training - TN - Final Exam

Helpers Training - TN - Final Exam

Professional Development

20 Qs

post test CRI kelas XI

post test CRI kelas XI

Professional Development

15 Qs

Valve Repair

Valve Repair

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Michael Zurek

Used 10+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Portions of the valve stem on an OS+Y gate valve are smooth because ______.

it looks workmanlike

it makes the stem glossier

it makes the valve work faster

it provides a smooth sealing surface

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The component that physically stops the flow of water when the valve is closed is the ______.

gland follower

gate

gland bolt

stuffing box

3.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Tightening the gland follower bolts _______.

compresses the packing

expands the packing

does nothing to the packing

compresses the valve handwheel

4.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The tool most commonly used to remove the old valve packing is _______.

a spud wrench

a post indicator wrench

a packing extractor

a valve packer

5.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Valve packing ________.

is available in one size and type only

size and type varies by valve

is always made of Teflon

is always precut

6.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The ends of the valve packing rings ______.

should be carefully aligned together

should be frayed

should be staggered 90 degrees

should overlap by 20 percent

7.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

After installing the new packing and reinstalling the gland follower, the gland bolts should be tightened _______.

to 50 ft./lbs.

to 75 ft./lbs.

to 100 ft./lbs.

until the valve stops leaking

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?