Formwork and floors

Authored by Beata Radziszewska

Architecture, World Languages

2nd Grade

Used 2+ times

Formwork and floors
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The formwork should be removed after the concrete is ...

cured

reused

striped

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

.... formwork is a reusable formwork that is removed around the concrete once it is set.

Temporary

Design strength

Lightweight

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

 

Plumbing ......., heating, and cooling equipment should be shown on the floor plan.

fixtures

diagrams

placement

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Dimensions are drawn between the walls to ...... room sizes and wall lengths.

indicate

specify

function

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A floor plan should show windows and doors, ........ such as stoves and refrigerators, and all interior rooms.

appliances

dimensions

fixtures

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Floors typically consist of a ...... for support and a floor covering.

mudsill

subfloor

span

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The horizontal supporting beams that run beneath the floor are called floor .....

joists

trusses

span

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?