
Formwork and floors
Authored by Beata Radziszewska
Architecture, World Languages
2nd Grade
Used 2+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
14 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The formwork should be removed after the concrete is ...
cured
reused
striped
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
.... formwork is a reusable formwork that is removed around the concrete once it is set.
Temporary
Design strength
Lightweight
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Plumbing ......., heating, and cooling equipment should be shown on the floor plan.
fixtures
diagrams
placement
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Dimensions are drawn between the walls to ...... room sizes and wall lengths.
indicate
specify
function
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A floor plan should show windows and doors, ........ such as stoves and refrigerators, and all interior rooms.
appliances
dimensions
fixtures
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Floors typically consist of a ...... for support and a floor covering.
mudsill
subfloor
span
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The horizontal supporting beams that run beneath the floor are called floor .....
joists
trusses
span
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?