1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The formwork should be removed after the concrete is ...

cured

reused

striped

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

.... formwork is a reusable formwork that is removed around the concrete once it is set.

Temporary

Design strength

Lightweight

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

 

Plumbing ......., heating, and cooling equipment should be shown on the floor plan.

fixtures

diagrams

placement

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Dimensions are drawn between the walls to ...... room sizes and wall lengths.

indicate

specify

function

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A floor plan should show windows and doors, ........ such as stoves and refrigerators, and all interior rooms.

appliances

dimensions

fixtures

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Floors typically consist of a ...... for support and a floor covering.

mudsill

subfloor

span

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The horizontal supporting beams that run beneath the floor are called floor .....

joists

trusses

span

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?