Double Check Valve Assembly

Double Check Valve Assembly

Professional Development

8 Qs

quiz-placeholder

Similar activities

BRAKES - part 2

BRAKES - part 2

Professional Development

10 Qs

Khám phá Sa Pa

Khám phá Sa Pa

Professional Development

10 Qs

Mengenal Baby GOL

Mengenal Baby GOL

Professional Development

10 Qs

How well do you know Cheryl Blossom?

How well do you know Cheryl Blossom?

KG - Professional Development

10 Qs

Kuis 1

Kuis 1

Professional Development

10 Qs

Relaxation

Relaxation

Professional Development

11 Qs

2023 Returning Teacher Quiz

2023 Returning Teacher Quiz

Professional Development

13 Qs

Life Insurance Basics

Life Insurance Basics

12th Grade - Professional Development

10 Qs

Double Check Valve Assembly

Double Check Valve Assembly

Assessment

Quiz

Fun

Professional Development

Easy

Created by

Class of 2020

Used 4+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is working as designed double check valve assembly?

# 1 check = 1.5 psig, # 2 check = .5 psig

# 1 check = .9 psig, # 2 check = 2.0 psig

# 1 check = 1.9 psig, # 2 check = 1.0 psig

# 1 check = .5 psig, # 2 check = 5.0 psig

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

when testing the #1 test check of a D/C, the bleed off valve and high side gauge hose must be connected to:

#1 tc

#2 tc

#3 tc

#4 tc

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

a leaking #2 shut-off valve can be compensated for by:

running a by-pass hose from #1 tc to #4 tc

opening and closing #1 shut-off valve

filling the site tube with water

lowering gauge to centerline of assembly

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

when testing #1 check, a leaking #1 shut-off valve can be compensated for by:

opening and closing #2 shut off valve

opening #4 tc

installing bleed-off valve on #4 tc

installing bleed-off valve on #2 tc

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

extreme back pressure on a check valve will cause:

the disc to imbed into the seat

the check valve to leak

a water hammer to condition

a high gauge reading

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

when testing the #2 check on a D/C, water continues to flow from #4 TC. The most probable cause would be:

a leaking #1 check valve

high side gauge needle open

#1 TC open

leaking #2 shut off valve with back-pressure

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

while testing the #1 check, the tester accidentally opens the high bleed valve. what would the results be:

have no affect on test because the high and bypass are closed

cause the gauge to go to "0"

indicate a leaking #1 shut off valve

indicate a leaking #2 shut off valve.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?