
Double Check Valve Assembly
Quiz
•
Fun
•
Professional Development
•
Easy
Class of 2020
Used 4+ times
FREE Resource
Enhance your content in a minute
8 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is working as designed double check valve assembly?
# 1 check = 1.5 psig, # 2 check = .5 psig
# 1 check = .9 psig, # 2 check = 2.0 psig
# 1 check = 1.9 psig, # 2 check = 1.0 psig
# 1 check = .5 psig, # 2 check = 5.0 psig
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
when testing the #1 test check of a D/C, the bleed off valve and high side gauge hose must be connected to:
#1 tc
#2 tc
#3 tc
#4 tc
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
a leaking #2 shut-off valve can be compensated for by:
running a by-pass hose from #1 tc to #4 tc
opening and closing #1 shut-off valve
filling the site tube with water
lowering gauge to centerline of assembly
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
when testing #1 check, a leaking #1 shut-off valve can be compensated for by:
opening and closing #2 shut off valve
opening #4 tc
installing bleed-off valve on #4 tc
installing bleed-off valve on #2 tc
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
extreme back pressure on a check valve will cause:
the disc to imbed into the seat
the check valve to leak
a water hammer to condition
a high gauge reading
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
when testing the #2 check on a D/C, water continues to flow from #4 TC. The most probable cause would be:
a leaking #1 check valve
high side gauge needle open
#1 TC open
leaking #2 shut off valve with back-pressure
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
while testing the #1 check, the tester accidentally opens the high bleed valve. what would the results be:
have no affect on test because the high and bypass are closed
cause the gauge to go to "0"
indicate a leaking #1 shut off valve
indicate a leaking #2 shut off valve.
8.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
what must the tester do when testing double check valve assemblies in a vertical position?
hold gauge at centerline
assure #2 shut-off valve is closed tight
install vertical tube
test #2 check first
Similar Resources on Wayground
10 questions
ID Operational Training Day - 5
Quiz
•
Professional Development
10 questions
April Quiz
Quiz
•
Professional Development
7 questions
IMPOSSIBLE QUIZ
Quiz
•
5th Grade - Professio...
10 questions
The Ultimate Taylor Swift Quiz
Quiz
•
KG - Professional Dev...
13 questions
LEGO 101
Quiz
•
Professional Development
10 questions
Quiz Time!
Quiz
•
Professional Development
10 questions
Bestie Test
Quiz
•
1st Grade - Professio...
10 questions
WildChina Education theory
Quiz
•
KG - Professional Dev...
Popular Resources on Wayground
5 questions
This is not a...winter edition (Drawing game)
Quiz
•
1st - 5th Grade
15 questions
4:3 Model Multiplication of Decimals by Whole Numbers
Quiz
•
5th Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
10 questions
The Best Christmas Pageant Ever Chapters 1 & 2
Quiz
•
4th Grade
12 questions
Unit 4 Review Day
Quiz
•
3rd Grade
10 questions
Identify Iconic Christmas Movie Scenes
Interactive video
•
6th - 10th Grade
20 questions
Christmas Trivia
Quiz
•
6th - 8th Grade
18 questions
Kids Christmas Trivia
Quiz
•
KG - 5th Grade
