Intro to Earthmoving

Intro to Earthmoving

12th Grade

20 Qs

quiz-placeholder

Similar activities

4.2.1-3 Conflicts Revision

4.2.1-3 Conflicts Revision

12th Grade

15 Qs

Economics Total Recall (Personal Finance)

Economics Total Recall (Personal Finance)

9th - 12th Grade

17 Qs

PINOY CHRISTMAS TRIVIA

PINOY CHRISTMAS TRIVIA

3rd Grade - University

15 Qs

Unit 1: Research Methods Psychology

Unit 1: Research Methods Psychology

11th - 12th Grade

20 Qs

College 101

College 101

9th - 12th Grade

20 Qs

Big Cats

Big Cats

3rd - 12th Grade

18 Qs

B5L4 Lab-Grown Meat Quiz

B5L4 Lab-Grown Meat Quiz

12th Grade

20 Qs

Burger

Burger

1st - 12th Grade

15 Qs

Intro to Earthmoving

Intro to Earthmoving

Assessment

Quiz

Other

12th Grade

Practice Problem

Medium

Created by

Skyler Venable

Used 74+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The first three steps in stabilization are to determine soil properties, the degree of compaction needed and

whether it will create runoff problems

the amount of binder required

whether rock particles are too large

the percentage of moisture needed

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

the removal of earth from a large, deep excavation with vertical sides is called

highway excavation

bulk-pit excavation

channel excavation

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

when large quantities of earth need to be moved 15000 feet, the equipment selected would be

backhoes

Front end loaders

scrapers

excavators

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

the traffic control supervisor on a construction project is responsible for

designing the traffic signs

directing the traffic flow

controlling operating conditions at the loading and dumping sites

evaluating the equipment drivers

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

NPDES storm water permit must be obtained if

more than one acre of land will be disturbed

storm water drains have not been installed

soil erosion is likely to occur

work is scheduled to be done on a rainy day

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the reason for analyzing the cycle time of a piece of equipment

it establishes the equipment's maintenance intervals

allows the contractor to estimate how long a job will take

determines how fast the operator can drive

provides documentation about operator safety

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

site access should be limited to authorized persons

only at night

during the day

during work

all the timed

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?