Intro to Earthmoving

Intro to Earthmoving

12th Grade

20 Qs

quiz-placeholder

Similar activities

Garden tools matching activity

Garden tools matching activity

12th Grade

17 Qs

Welding Shop Safety

Welding Shop Safety

9th - 12th Grade

20 Qs

Animal Behaviour Assessment

Animal Behaviour Assessment

12th Grade

16 Qs

Construction Safety Terms Quiz

Construction Safety Terms Quiz

9th - 12th Grade

22 Qs

POM: Permit System

POM: Permit System

10th Grade - Professional Development

20 Qs

Athletic Training General

Athletic Training General

9th - 12th Grade

15 Qs

Footing & Foundation Quiz

Footing & Foundation Quiz

10th - 12th Grade

15 Qs

Don't underestimate Natural Resources

Don't underestimate Natural Resources

5th Grade - Professional Development

16 Qs

Intro to Earthmoving

Intro to Earthmoving

Assessment

Quiz

Other

12th Grade

Medium

Created by

Skyler Venable

Used 74+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The first three steps in stabilization are to determine soil properties, the degree of compaction needed and

whether it will create runoff problems

the amount of binder required

whether rock particles are too large

the percentage of moisture needed

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

the removal of earth from a large, deep excavation with vertical sides is called

highway excavation

bulk-pit excavation

channel excavation

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

when large quantities of earth need to be moved 15000 feet, the equipment selected would be

backhoes

Front end loaders

scrapers

excavators

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

the traffic control supervisor on a construction project is responsible for

designing the traffic signs

directing the traffic flow

controlling operating conditions at the loading and dumping sites

evaluating the equipment drivers

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

NPDES storm water permit must be obtained if

more than one acre of land will be disturbed

storm water drains have not been installed

soil erosion is likely to occur

work is scheduled to be done on a rainy day

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the reason for analyzing the cycle time of a piece of equipment

it establishes the equipment's maintenance intervals

allows the contractor to estimate how long a job will take

determines how fast the operator can drive

provides documentation about operator safety

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

site access should be limited to authorized persons

only at night

during the day

during work

all the timed

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?