1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A document which shows when each trade should be on site is called?
Work/Gantt schedule
Holiday schedule
Trade schedule
Time schedule
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A document which shows how things in a plumbing system are connected together is called?
Architects drawing
Installation plan
Schematic drawing
Scale drawing
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
One of the first things to be done when building a new house is?
Roof goes on
Walls are built
Plumbing 1st fix
Foundations are completed
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When the plumber and electrician are needed to install all the pipes and cables ready for the appliances later on this is known as?
1st fix
Initial installation
Complete installation
2nd fix
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A document which shows you how to install a specific item correctly and safely is known as?
Maintenance instructions
Scale drawing
Manufacturers Installation instructions
Schematic drawing
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
This type of floor construction is commonly known as a?
Solid floor
Wooden floor
Concrete floor
Joist floor
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is it called when the whole plumbing system is completed and it is ready to be started for the first time?
First turn on
Commissioning
System check
System testing
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?