IBS Installation

IBS Installation

University

8 Qs

quiz-placeholder

Similar activities

IBS Formwork System

IBS Formwork System

University

6 Qs

Topic 4: Designing for Indoor Air Quality

Topic 4: Designing for Indoor Air Quality

University

10 Qs

Engineering Woods

Engineering Woods

10th Grade - University

10 Qs

STAGES OF CONSTRUCTION

STAGES OF CONSTRUCTION

University

13 Qs

Building Services - AC

Building Services - AC

University

10 Qs

Reading a Ruler (Metric)

Reading a Ruler (Metric)

KG - Professional Development

10 Qs

 IBS Structural System

IBS Structural System

University

12 Qs

AAR651_LECTURE 2

AAR651_LECTURE 2

University

10 Qs

IBS Installation

IBS Installation

Assessment

Quiz

Architecture

University

Medium

Created by

DR IDA

Used 4+ times

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does IBS stands for?

Industrial Build System

Industrialised Building System

Industry Build System

Industrialised Building Safety

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

All types of IBSs are categorized under these three category EXCEPT

CONVENTIONAL METHOD

CAST-IN-SITU

COMPOSITE METHOD

FULLY PREFABRICATED

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many type of IBS is used in Malaysia?

3

4

5

6

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The picture shows INTERLOCKING CONCRETE MASONRY UNIT.

This falls in which of the IBS type?

Pre-Cast Box System

Steel Framing System

Prefabricated Timber System

Block Work System

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Types of IBS used in Malaysia EXCEPT

BOX SYSTEM

STEEL FORMWORK SYSTEM

BLOCKWORK SYSTEM

SYSTEM CONSTRUCTION

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the difference between precast and prefabricated structures?

SIZE OF COMPONENT

USE OF COMPONENT

JOINTING OF COMPONENT

METHOD OF ASSEMBLE

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The sequence of work in IBS can be divided into THREE stages. Manufacturing, transporting and ____________?

POSITIONING

ASSEMBLING

ERECTING

JOINTING

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

IBS can mainly save the cost by........

allowing for a repetitive use of formwork

reducing labour requirement at site

reducing material wastage

ALL OF THE ABOVE