Carpentry test

Carpentry test

9th - 12th Grade

85 Qs

quiz-placeholder

Similar activities

Carpentry II -  Exterior Finishing

Carpentry II - Exterior Finishing

Carp 2 27109 Intro to Building Envelope System  (EQ's 15)

Carp 2 27109 Intro to Building Envelope System (EQ's 15)

Carp. II Intro to Bldg. Envelope Systems 1-15

Carp. II Intro to Bldg. Envelope Systems 1-15

House wrap

House wrap

Carpentry EOPA Part 2

Carpentry EOPA Part 2

Building Envelope System

Building Envelope System

Session Eleven Quiz

Session Eleven Quiz

Carpentry test

Carpentry test

Assessment

Quiz

Instructional Technology

9th - 12th Grade

Medium

Created by

James Martin

Used 221+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

85 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the best way to install drywall vertically

Cut edges should be placed in the corners

The height of the drywall should be around 1/8 inch short of the ceiling

End joint should fall on the same stud

Pre-bowing will increase the number of screws needed

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of these tools is most commonly used to cut drywall?

Crosscut saw

 

Rip saw

Chop saw

Utility knife

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which statement(s) accurately describe the correct application of drywall on walls horizontally 

Butt joints should not be staggered

A beveled edge should not be installed next to a cut edge.

The bottom drywall panel should be installed first

For walls more than 8'-1" high, drywall is always installed vertically

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of these may be appropriate when laying wood flooring?

In remodeling, the base shoe usually is removed before laying a floor.

Flooring laid in the direction of the longest dimension usually looks the best.

In new construction, casings and base are usually not installed until after the floor is laid.

 

All of the above

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of these is the first step in installing windows?

 

Flash the head casing.

 

Caulk the backside of the casing or nail flange.

Center the window in the opening.

Check the size of the rough opening.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The top and bottom horizontal members of a wall frame are called______.

Plates

Sills

Jacks

Trimmers

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which types of insulation is most commonly used between trusses and ceiling joist?

Loose fill Insulation

Reflective foil

Duct Insulation

Pipe Insulation

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?