Design Part 1

Design Part 1

Professional Development

19 Qs

quiz-placeholder

Similar activities

RA 9266

RA 9266

Professional Development

20 Qs

JPT - BP344 QUIZ 1

JPT - BP344 QUIZ 1

Professional Development

15 Qs

Code of Ethics

Code of Ethics

Professional Development

20 Qs

Code of Ethical Conduct

Code of Ethical Conduct

Professional Development

20 Qs

*Day 1- ALE

*Day 1- ALE

Professional Development

20 Qs

Section 1_B15 Adv GATE_16.12

Section 1_B15 Adv GATE_16.12

Professional Development

16 Qs

Bisiness Statistics (descriptive2)

Bisiness Statistics (descriptive2)

Professional Development

14 Qs

THEORY OF STRUCTURES III

THEORY OF STRUCTURES III

Professional Development

21 Qs

Design Part 1

Design Part 1

Assessment

Quiz

Architecture

Professional Development

Medium

Created by

Ar.Cath B

Used 1+ times

FREE Resource

19 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To attain an overall design economy, operation maintenance consideration, where should the downspouts be positioned with respect to the house?

at the columns

along the property walls

at the rear of the house

at the sides of the house

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Given the project Site orientation, from what direction shall the "amihan" wind come from

East

Southwest (SW)

Southeast (SE)

Northeast (NE)

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT part of RROW?

Sidewalk

Median

Curb

Front yard

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Assuming a very heavily forested hillside location for Project Site and the

budget constraint. what type of roof structure should be introduced for the Prototype Houses?

Steep, sable-shaped metal roof on welded steel frame.

Very-steep, asphalt shingle roofing on marine plywood on assembled metal frame.

Low-pitch, deck roof.

Composite with slope

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of (R-1 Use) foundation should ideal if the lot is sloping upwards?

Combined

Mat

Isolated

Retained Wall

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Assuming a Project Site location that is 150.00m away from a very high voltage transmission line, what type of projections should NOT be introduced for the Prototype?

Extended eaves

Sun-breakers

Balconies

Canopy

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Assuming that a firewall-quality wall thickness is required by an Owner, what should be the nominal thickness of the concrete hollow block unit (in meters) for the exterior walls of the Prototype House?

0.10

0.20

0.25

0.15

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?