Demolition Works

Demolition Works

University

8 Qs

quiz-placeholder

Similar activities

Architectural Design V

Architectural Design V

University

11 Qs

FBC: Introduction to FBC

FBC: Introduction to FBC

University

12 Qs

7) Project Management and Filing.

7) Project Management and Filing.

University

10 Qs

L1: Overview of Building Science & Services I

L1: Overview of Building Science & Services I

University

10 Qs

S4.2: Feasibility Report

S4.2: Feasibility Report

University

10 Qs

Time Management in Building Construction

Time Management in Building Construction

University

8 Qs

Foundree Housing and Land Reform Shortee

Foundree Housing and Land Reform Shortee

University

5 Qs

Pre-fabrication system

Pre-fabrication system

University

10 Qs

Demolition Works

Demolition Works

Assessment

Quiz

Architecture

University

Medium

Created by

DR IDA

Used 5+ times

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the Progressive Demolition?

•Removal the key structural members to cause complete collapse of the whole structure

•Commonly  known as top – down demolition

•removal of selected parts of the structure by dismantling or deconstruction.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Examples of Deliberate Collapse Mechanisms are

Hand Demolition

Explosive

Wrecking Ball

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Examples of Progressive Demolition are below EXCEPT

Pusher Arm

Wrecking Ball

Wire Rope Pulling

Hand Demolition

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The PRE DEMOLITION PHASES are as below

Site survey - Site Preparation - Soft Stripping - Recycling & Reuse

Site Preparation - Soft Stripping - Recycling & Reuse

Site survey - Site Preparation - Recycling & Reuse - Soft Stripping

Site survey - Recycling & Reuse - Soft Stripping

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A demolition is to be used for 1-storey Shoplot.

Proposed the best method that is most suitable for this project

Wrecking Ball

Hand Demolition

Pusher Arm

Explosion

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

20-Storey High Building is to be demolished.

The site has no adequate access.

Proposed the best method for this activity.

Explosion

Wire Rope

Wrecking Ball

Hand Demolition

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A 5-storey Building is to be demolished.

Adequate access is available.

What is the most economical method to be used?

Explosive

Wrecking Ball

Wire Rope

Pusher Arm

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The Picture shows

Explosion

Wire Rope

Wrecking Ball

Hand Demolition