Demolition Works

Demolition Works

University

8 Qs

quiz-placeholder

Similar activities

Time Management in Building Construction

Time Management in Building Construction

University

8 Qs

Elevations

Elevations

11th Grade - Professional Development

10 Qs

3D Rigid Body Equilibrium

3D Rigid Body Equilibrium

University

10 Qs

BQS601 INTRODUCTION

BQS601 INTRODUCTION

University

12 Qs

7) Project Management and Filing.

7) Project Management and Filing.

University

10 Qs

Architectural Lingo (Part 2 of 2)

Architectural Lingo (Part 2 of 2)

University - Professional Development

12 Qs

MODULE 2 HOUSING

MODULE 2 HOUSING

University

10 Qs

Key Players in Construction

Key Players in Construction

University

10 Qs

Demolition Works

Demolition Works

Assessment

Quiz

Architecture

University

Practice Problem

Medium

Created by

DR IDA

Used 5+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the Progressive Demolition?

•Removal the key structural members to cause complete collapse of the whole structure

•Commonly  known as top – down demolition

•removal of selected parts of the structure by dismantling or deconstruction.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Examples of Deliberate Collapse Mechanisms are

Hand Demolition

Explosive

Wrecking Ball

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Examples of Progressive Demolition are below EXCEPT

Pusher Arm

Wrecking Ball

Wire Rope Pulling

Hand Demolition

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The PRE DEMOLITION PHASES are as below

Site survey - Site Preparation - Soft Stripping - Recycling & Reuse

Site Preparation - Soft Stripping - Recycling & Reuse

Site survey - Site Preparation - Recycling & Reuse - Soft Stripping

Site survey - Recycling & Reuse - Soft Stripping

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A demolition is to be used for 1-storey Shoplot.

Proposed the best method that is most suitable for this project

Wrecking Ball

Hand Demolition

Pusher Arm

Explosion

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

20-Storey High Building is to be demolished.

The site has no adequate access.

Proposed the best method for this activity.

Explosion

Wire Rope

Wrecking Ball

Hand Demolition

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A 5-storey Building is to be demolished.

Adequate access is available.

What is the most economical method to be used?

Explosive

Wrecking Ball

Wire Rope

Pusher Arm

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The Picture shows

Explosion

Wire Rope

Wrecking Ball

Hand Demolition