
Domestic Cold Water 6035-02 | Part 2
Authored by George Harding
Other
Professional Development
Used 209+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
40 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What component must be sited immediately after the supply stop valve on entry to a property?
Single check valve
Ferrule valve
Drain off valve
Service valve
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of valve should be installed in order to isolate the CWSC?
Service valve
Float operated valve
Gate valve
Stop valve
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If the service pipe is located within 750mm of the outside wall, what action should be taken?
Contact the Water Undertaker
Reposition pipework further than 750mm
Reposition the wall so the pipework is further than 750mm
Insulate the pipework
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Limescale is created by what mineral being in temporary hard water?
Calcium carbonate
Sodium
Soft water
Calcium sulphate
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What pipes is the Water Undertaker responsible for maintaining?
Communication pipes
Service pipes
Both pipes
None of the pipes
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is NOT known as a "Underground sources" of water?
Wells
Borehole
Springs
Streams
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What item should be used to test the PPM in water?
Weir cup
Pressure gauge
Flow cup
Hardness test kit
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?