Lesson 3 - Victor's Journal Vocabulary

Lesson 3 - Victor's Journal Vocabulary

2nd Grade

12 Qs

quiz-placeholder

Similar activities

Victor's Journal (Story & Vocabulary)

Victor's Journal (Story & Vocabulary)

2nd Grade

8 Qs

3/10 ELA Vocabulary Test

3/10 ELA Vocabulary Test

2nd Grade

12 Qs

Lesson 18

Lesson 18

2nd Grade

12 Qs

Review Science - Week 7 (Unit 4)

Review Science - Week 7 (Unit 4)

2nd Grade

13 Qs

Homographs

Homographs

KG - University

15 Qs

This, That, These, Those

This, That, These, Those

1st - 2nd Grade

12 Qs

Open Court 3-3 Vocab

Open Court 3-3 Vocab

2nd Grade

14 Qs

Lacy's Quiz

Lacy's Quiz

2nd Grade

12 Qs

Lesson 3 - Victor's Journal Vocabulary

Lesson 3 - Victor's Journal Vocabulary

Assessment

Quiz

English

2nd Grade

Medium

CCSS
RI.1.4, RF.2.3C, RI.2.4

+9

Standards-aligned

Created by

Kristen M Walker

Used 49+ times

FREE Resource

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

While

A period of time

A paper printed with white lines on a blue background, used to show the plan for building something.

A very long time

The skeleton of a building or a border or case for enclosing a picture, mirror.

Tags

CCSS.RI.1.4

CCSS.RI.2.4

CCSS.RI.3.4

CCSS.RI.K.4

CCSS.RL.3.4

2.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Blueprints

A period of time

A paper printed with white lines on a blue background, used to show the plan for building something.

A very long time

The skeleton of a building or a border or case for enclosing a picture, mirror.

Tags

CCSS.RI.1.4

CCSS.RI.2.4

CCSS.RI.3.4

CCSS.RL.3.4

CCSS.RL.4.4

3.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Cement

A sidewalk

A paper printed with white lines on a blue background, used to show the plan for building something.

A powder made by burning a mixture of limestone and clay.

The skeleton of a building or a border or case for enclosing a picture, mirror.

Tags

CCSS.RI.1.4

CCSS.RI.2.4

CCSS.RI.3.4

CCSS.RI.K.4

CCSS.RL.3.4

4.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Lever

A sidewalk

A rod or bar attached to a machine, used to work or control it.

A powder made by burning a mixture of limestone and clay.

The skeleton of a building or a border or case for enclosing a picture, mirror.

Tags

CCSS.RI.1.4

CCSS.RI.2.4

CCSS.RI.3.4

CCSS.RI.4.4

CCSS.RL.3.4

5.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Insulated

To cover or surround with material that is used to slow or stop the flow of electricity, heat, or sound.

A rod or bar attached to a machine, used to work or control it.

A powder made by burning a mixture of limestone and clay.

The skeleton of a building or a border or case for enclosing a picture, mirror.

Tags

CCSS.RI.1.4

CCSS.RI.2.4

CCSS.RI.3.4

CCSS.RI.K.4

CCSS.RL.3.4

6.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Frame

A period of time

A paper printed with white lines on a blue background, used to show the plan for building something.

A very long time

The skeleton of a building or a border or case for enclosing a picture, mirror.

Tags

CCSS.RI.1.4

CCSS.RI.2.4

CCSS.RI.3.4

CCSS.RI.4.4

CCSS.RL.3.4

7.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Media Image

The construction worker slowly mixed the water and sand together to make ______ to form a sidewalk.

Cement

Lever

Blueprints

Ground

Tags

CCSS.RI.1.4

CCSS.RI.2.4

CCSS.RI.3.4

CCSS.RI.K.4

CCSS.RL.3.4

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for English