Basic Agile

Basic Agile

University

7 Qs

quiz-placeholder

Similar activities

Mini quiz - rollen scrum

Mini quiz - rollen scrum

University

10 Qs

Agile and Design thinking

Agile and Design thinking

University

8 Qs

OOSWE_3

OOSWE_3

University

10 Qs

Quiz_14_MA

Quiz_14_MA

University

10 Qs

Why Agile?

Why Agile?

University

10 Qs

Tutorial SDLC

Tutorial SDLC

University

10 Qs

[PDA2025] Scrum

[PDA2025] Scrum

University

10 Qs

Metode Scrum dan Pengembangan Agile

Metode Scrum dan Pengembangan Agile

University

10 Qs

Basic Agile

Basic Agile

Assessment

Quiz

Computers

University

Medium

Created by

Li Da Gan

Used 2+ times

FREE Resource

7 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What are different types of Agile Methodology?

Scrum

Kanban

ASD (Adaptive System Development)

linear-sequential life cycle

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What are advantages of Agile Process?

Fast and continuous development

formal documentation and designing

Enables collaboration and interaction between client and project team

Division of agile project into sprints or iterations

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What are disadvantages of Agile Process.

Adapt poorly with changing requirements

Requires more time and energy from everyone 

Risk of ever-lasting project

Lack of formal documentation and designing

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What's the product backlog?

It is generally owned and maintained by the product owner.

contains each and every feature/requirement of the product.

It is specific to the sprint goal only.

breaks down every item into a series of steps.

5.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What's the sprint backlog?

It is generally owned by the development team.

It is more specific to the end goal of the product.

It is considered a subset of the product backlog.

It is compiled of everything that must be done to complete a particular sprint.

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which statemets are true about Agile Software Development?

They collaborate with customers in each and every step throughout the process.

This method is more suitable for large or more complex projects. 

In this, testing is usually done parallel to the development activity.

In this, testing is usually done at the end of the development activity.

7.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Media Image

Reorder them -- sprint, product backlog, product increment, sprint backlog, project vision