Random Plumbing 02

Random Plumbing 02

Professional Development

•

40 Qs

quiz-placeholder

Similar activities

Core Solutions Q1 2022

Core Solutions Q1 2022

Professional Development

•

40 Qs

creative imedia

creative imedia

11th Grade - Professional Development

•

40 Qs

RIA Mock ver 3

RIA Mock ver 3

University - Professional Development

•

40 Qs

Anatomy and Body Systems pt.3

Anatomy and Body Systems pt.3

Professional Development

•

35 Qs

CU06:APPERTIZER PRODUCTION

CU06:APPERTIZER PRODUCTION

Professional Development

•

41 Qs

Intellectual Property Rights

Intellectual Property Rights

Professional Development

•

38 Qs

Car Maintenance 3-22-2022

Car Maintenance 3-22-2022

Professional Development

•

38 Qs

Fortnite Chapter 2 season 4

Fortnite Chapter 2 season 4

KG - Professional Development

•

37 Qs

Random Plumbing 02

Random Plumbing 02

Assessment

Quiz

•

Other

•

Professional Development

•

Practice Problem

•

Medium

Created by

Johnny Thulin

Used 9+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When a union is provided for an appliance connected by rigid metallic pipe, the union shall be accessible and located within ___________________feet of the appliance.

2
3
4
6
411.1.6 IFGC

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A __________ is not required for a sewage sump and ejector.

pump alarm
vent
check valve
full open valve
712.2 and 712.3.2

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When required to discharge to a combined building sewer system, floor drains in a __________ are not required to be individually trapped.

food preparation facility
multilevel parking garage
warehouse
factory
1002.1, Exception 4

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

An indirect waste pipe that discharges through an air break must terminate above the __________ of the waste receptor.

flood level rim
trap seal
critical level
strainer dome
802.3.2

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Where tests are required as evidence of compliance with the code, the test reports code, the test reports shall be retained for __________. shall be retained for __________. shall be retained for __________.

180 days after completion of the project
the period required for retention of public records
90 days after completion of the project
120 days after occupancy of the building
105.3.3

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When a plumbing permit is issued, the construction documents shall be stamped __________.

APPROVED FOR CONSTRUCTION
APPROVED
ACCEPTED AS REVIEWED
REVIEWED FOR CODE COMPLIANCE
106.5.1

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Floor drains in walk-in refrigerators of food establishments shall be __________.

directly connected to the drainage system
connected to the drainage system protected with a backwater valve
y connected to the drainage system by means of an air gap
y connected to the drainage system by means of an air break
802.1.2

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?