Hort2Landscaping_5.05 Hardscape procedures.

Hort2Landscaping_5.05 Hardscape procedures.

9th - 12th Grade

11 Qs

quiz-placeholder

Similar activities

Oral Interpretation

Oral Interpretation

9th Grade

15 Qs

Know your Films?-10

Know your Films?-10

8th Grade - University

10 Qs

CJ 2 Chapter 4 Vocab 2

CJ 2 Chapter 4 Vocab 2

11th - 12th Grade

12 Qs

90's Nickelodeon Trivia

90's Nickelodeon Trivia

KG - 12th Grade

10 Qs

Music Trivia

Music Trivia

3rd - 12th Grade

10 Qs

Riddles & Logos!

Riddles & Logos!

5th - 12th Grade

11 Qs

Paving Quiz 2

Paving Quiz 2

10th Grade

10 Qs

Pre-Employment Screening Quiz

Pre-Employment Screening Quiz

12th Grade

15 Qs

Hort2Landscaping_5.05 Hardscape procedures.

Hort2Landscaping_5.05 Hardscape procedures.

Assessment

Quiz

Other

9th - 12th Grade

Easy

Created by

Graylyn Bauguess

Used 1+ times

FREE Resource

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Erica has added and compacted soil so the pavers will be level with the border. What is the next procedure she should use?

attach the strings to stakes

cut pavers as needed

set pavers on the surface

sweep screenings into cracks

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Matt needs to install a dry stack stone in a landscape. What should he do first?

select the right tools

set the borders of the project

set stones so they overlap

sweep screenings into the cracks

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Rico has measured the area for his pavers. What is the next step in the process?

add and compact the fill material

drive stakes at each corner

set pavers in a pattern

sweep screenings in the cracks

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Grace has the first layer of wall stones installed. What is the next step in the procedure?

install the second layer in an overlapping or staggering pattern

install the second layer so that joints are over first layer joints

pressure wash all stones before installing

throw away stones that are not flat and smooth

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After using the recommended procedures for all layers of a dry stack stone wall, what should the installer do next?

check to be certain flat side is on the back side

make the layer unlevel as possible

use the prettiest stones for the top row

use the roughest stones to add character

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Chelsea checked the slope of the are to be paved and found the slope to be 3%. What should she do next?

attach strings to the corner stakes

cut pavers to maintain the pattern

remove some soil on the high end

use measuring tape to lay out the area

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Marquez has measured the site to install a stone wall. What should he do next?

Add and compact the fill material

drive markers at each corner

set stones in a pattern

sweep screenings into the cracks

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?