Search Header Logo

Hort2Landscaping_5.05 Hardscape procedures.

Authored by Graylyn Bauguess

Other

9th - 12th Grade

Used 1+ times

Hort2Landscaping_5.05 Hardscape procedures.
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Erica has added and compacted soil so the pavers will be level with the border. What is the next procedure she should use?

attach the strings to stakes

cut pavers as needed

set pavers on the surface

sweep screenings into cracks

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Matt needs to install a dry stack stone in a landscape. What should he do first?

select the right tools

set the borders of the project

set stones so they overlap

sweep screenings into the cracks

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Rico has measured the area for his pavers. What is the next step in the process?

add and compact the fill material

drive stakes at each corner

set pavers in a pattern

sweep screenings in the cracks

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Grace has the first layer of wall stones installed. What is the next step in the procedure?

install the second layer in an overlapping or staggering pattern

install the second layer so that joints are over first layer joints

pressure wash all stones before installing

throw away stones that are not flat and smooth

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After using the recommended procedures for all layers of a dry stack stone wall, what should the installer do next?

check to be certain flat side is on the back side

make the layer unlevel as possible

use the prettiest stones for the top row

use the roughest stones to add character

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Chelsea checked the slope of the are to be paved and found the slope to be 3%. What should she do next?

attach strings to the corner stakes

cut pavers to maintain the pattern

remove some soil on the high end

use measuring tape to lay out the area

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Marquez has measured the site to install a stone wall. What should he do next?

Add and compact the fill material

drive markers at each corner

set stones in a pattern

sweep screenings into the cracks

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?