Phase test 3 revision CT

Phase test 3 revision CT

6th - 8th Grade

21 Qs

quiz-placeholder

Similar activities

Marist Feud

Marist Feud

7th - 12th Grade

20 Qs

세종 한국어 1 시험

세종 한국어 1 시험

7th Grade

17 Qs

EURO 2020

EURO 2020

2nd - 9th Grade

16 Qs

TLE 8 REVIEW THIRD

TLE 8 REVIEW THIRD

6th - 8th Grade

18 Qs

The Wednesday Wars -20 Question Quiz.

The Wednesday Wars -20 Question Quiz.

6th Grade

20 Qs

REVIEW-GRADE8

REVIEW-GRADE8

8th Grade

20 Qs

QUIZ 1 : TOPIC 8 [PROCESS COSTING]

QUIZ 1 : TOPIC 8 [PROCESS COSTING]

1st Grade - University

20 Qs

Vocabulary Unit 1 Passages

Vocabulary Unit 1 Passages

1st - 6th Grade

17 Qs

Phase test 3 revision CT

Phase test 3 revision CT

Assessment

Quiz

Education

6th - 8th Grade

Practice Problem

Easy

Created by

min Zhen

Used 4+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

21 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

which part of scaffolding serves as a working place and support loads?

platform

standard

transom

toe board

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what is the required height for a toe-board by referring to the standard regulation for working platform?

280mm

180mm

150mm

100mm

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

information required in scaffolding inspection report is:

1. location and description of scaffolding​

2. date of inspection

​ 3. __________

​ 4. result of ​ inspection

5. signature of the person who made the inspection

identification of the inspection

types of the scaffolding

durability of the scaffolding

condition of the scaffolding

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

which statement is the correct definition of PACKING the terms used in describing formwork and falsework?

vertical timber or steel to support formwork

block of wood used to fill a gap and provide support

horizontal timber member designed to carry load

horizontal framework or collar that supporting the column formwork

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what is the purpose of providing speed restriction ramped and painted across the road?

to encourage vehicle to stop

to encourage vehicle to slow down

to encourage vehicle to go faster

to prevent vehicle enter this areas

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

which one is NOT an example method of road surfacing?

flexible construction

rigid construction

fixed construction

semi-rigid construction

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

which of the term used to described a piece of wood of projection to prevent slipping in the construction of formwork?

bearer

cleat

crosshead

prop

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?