Phase test 3 revision CT

Phase test 3 revision CT

6th - 8th Grade

21 Qs

quiz-placeholder

Similar activities

REVISION CHAPTER 8 & 9

REVISION CHAPTER 8 & 9

3rd Grade - University

20 Qs

Scholar Bowl Tryouts

Scholar Bowl Tryouts

5th - 8th Grade

20 Qs

Quarter 2 Civics Review (2021)

Quarter 2 Civics Review (2021)

7th Grade

18 Qs

Tensegrity Structure

Tensegrity Structure

6th - 12th Grade

20 Qs

Maths Quiz

Maths Quiz

6th Grade

20 Qs

General Knowledge Challenge

General Knowledge Challenge

6th Grade

20 Qs

Harry Potter Trivia for kids

Harry Potter Trivia for kids

4th - 6th Grade

20 Qs

Unit 6: Age of Jackson Practice Test

Unit 6: Age of Jackson Practice Test

8th Grade

20 Qs

Phase test 3 revision CT

Phase test 3 revision CT

Assessment

Quiz

Education

6th - 8th Grade

Easy

Created by

min Zhen

Used 4+ times

FREE Resource

21 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

which part of scaffolding serves as a working place and support loads?

platform

standard

transom

toe board

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what is the required height for a toe-board by referring to the standard regulation for working platform?

280mm

180mm

150mm

100mm

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

information required in scaffolding inspection report is:

1. location and description of scaffolding​

2. date of inspection

​ 3. __________

​ 4. result of ​ inspection

5. signature of the person who made the inspection

identification of the inspection

types of the scaffolding

durability of the scaffolding

condition of the scaffolding

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

which statement is the correct definition of PACKING the terms used in describing formwork and falsework?

vertical timber or steel to support formwork

block of wood used to fill a gap and provide support

horizontal timber member designed to carry load

horizontal framework or collar that supporting the column formwork

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what is the purpose of providing speed restriction ramped and painted across the road?

to encourage vehicle to stop

to encourage vehicle to slow down

to encourage vehicle to go faster

to prevent vehicle enter this areas

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

which one is NOT an example method of road surfacing?

flexible construction

rigid construction

fixed construction

semi-rigid construction

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

which of the term used to described a piece of wood of projection to prevent slipping in the construction of formwork?

bearer

cleat

crosshead

prop

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?