Zayan

Zayan

5th Grade

7 Qs

quiz-placeholder

Similar activities

Nat 5 Metalworking

Nat 5 Metalworking

4th - 5th Grade

6 Qs

TR1B -Analyse fuites-

TR1B -Analyse fuites-

1st - 8th Grade

4 Qs

Scholastic

Scholastic

KG - University

7 Qs

Spring Orientation! Did you know?! Trivia!

Spring Orientation! Did you know?! Trivia!

KG - University

12 Qs

Pre-valoración Manejo CUCI

Pre-valoración Manejo CUCI

1st - 12th Grade

10 Qs

Warunki w pomieszczeniach biurowych

Warunki w pomieszczeniach biurowych

1st - 5th Grade

6 Qs

Community Food Rescue

Community Food Rescue

KG - University

11 Qs

MASTER THE BASICS

MASTER THE BASICS

1st - 10th Grade

10 Qs

Zayan

Zayan

Assessment

Quiz

Specialty

5th Grade

Hard

Created by

ray T

Used 2+ times

FREE Resource

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

In this diagram

If 10X = Y, then Y =

105 degrees

200 degrees

180 degrees

105 degrees

220 degrees

Answer explanation

Sum of all angles = 360.

So, 4X + Y + 80 = 360.

4X + 10X = 360 - 80.

14X = 280.

This means X = 20.

Hence, Y = 10 x 20 = 200.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Adam drives at 60 kilometers per hour for a part of the route, then accelerates to 100 kilometers per hour for the rest of the way.

The trip takes him eight hours. The trip is 700km total.

How many hours has he been driving at 60 kmph?

2 hrs 40 min

4 hrs 40 min

3 hrs 12min

2 hrs 30 min

3 hrs 20 min

Answer explanation

If Ron was driving at 60 km/h for 'h' hours, then distance covered in that time = 60h km.

He would have, therefore, travelled the balance (8 – h) hours at 100 kmph.

Distance covered in this (8 – h) hours = (8 − h) × 100 = (800 – 100h) km.

The total distance travelled = 60h + 800 – 100h = 700.

h = 2.5

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

44 employees can complete a task in 16 days, working 5 hours a day.

In how many days will 110 employees, working 8 hours a day, complete the work?

8

16

4

5

7

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It is a non-leap year and today is Tuesday. What day would it be after 459 days?

Saturday

Sunday

Monday

Tuesday

Friday

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The diameter of a circular garden is 120m.

The garden has 3 rounds of wire fencing.

If the wire costs 15 dollars per meter, find the cost of the wire.

15845

19528

17000

16956

12452

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Two balls A and B rotate along a circular track. Ball A makes 3 full rotations in 36 minutes. Ball B makes 8 full rotations in 40 minutes. If they start rotating now from the same point, when will they be at the same starting point again?

60

75

72

5

18

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the following series 2, 3, 5, 6, 11, 12, 23,  _____, the number after 23 is

33

35

24

28

34

Answer explanation

The sequence is (Plus previous number), (Plus 1), (Plus previous number), (Plus 1)