Search Header Logo

Level one plumbing and above ground drainage

Authored by Craig Boothright

Other

Professional Development

Used 38+ times

Level  one plumbing and above ground drainage
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

15 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

45 sec • 4 pts

Which tools would you commonly use working on Rainwater Guttering Plastic waste Pipe

Blow Lamp

Screwdriver

Multipurpose saw

Plumb bob

chamfering tool

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What kind of guttering must you not remove and requires specialist attention?

Cast Iron

Plastic

Asbestos cement

Lead

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Working with push fit waste pipe what needs to be carried out prior assembly?

Heated with blowlamp

Cleaned and fluxed

Chamfer and lubricated

Deburred and glued

4.

MULTIPLE SELECT QUESTION

45 sec • 3 pts

Tradesman's tools should be kept

Clean

Under his bed

Sharp

In a bucket

Lubricated

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

what is this item called?

Hopper head

Rainwater boot

Rainwater bend

Rainwater shoe

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A Bath has waste pipe connection of?

1"1/4"

50mm

40m

2"

40mm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum spacing of gutter fascia brackets?

1.5m

1.0mm

0.75m

0.5cm

1.0m

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?