1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the rated differential pressure between supply and exhaust pressure on a Green Banana model Monkey Pump?

1000 psi

600 psi

200 psi

Doesn't matter!

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Ovintiv SARP (OVV-C-PLINE-RF-001) titled “General Good Practices for Pipeline Design” allows pressure relieving and limiting devices to be set to a maximum of 110% of MOP as per CSA Z662

Ture

False

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the cumulative rated power of compressor drivers that requires a site to have a Waste Discharge Permit in BC?

100 kW

600 kW

3000 kW

10,000 kW

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When do line heaters NOT require a Waste Discharge Authorization in BC?

A - Combust Sweet Gas

B - Combust High Sulfur gas & rated at less than 150 kW

C - Always Requred

D - Both A & B

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You need to install 1/2" OD tubing to supply fuel gas to a heater inside a building.  The existing fuel gas piping class is AAB. 

What wall thickness tubing should you use?

0.035"

0.049"

0.065"

0.083"

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For a Differential Pressure Indicating Transmitter (DPIT) installed across a water filtration pot, what is the preferred location for the downstream connection of the DPIT?

Upstream of the filters outlet DBB valve

Downstream of the filter outlet DBB valve

Either side of the filter outlet DBB valve

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When assessing fitness for service of a pipeline with corrosion imperfections, which of the following statements is true?

Minimum wall thickness must be at least design wall thickness calculated from the appropriate formula in Clause 4 of CSA Z66

Pipeline MOP must be less than the failure pressure calculated in CSA Z662 Clause 10, taking into account design, location, joint and temperature factors

The Estimated Repair Factor (MOP/Burst Pressure), using the B31G calculations for burst pressure must be greater than .500

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?