Distribution #2

Distribution #2

3rd Grade

17 Qs

quiz-placeholder

Similar activities

Transformers

Transformers

KG - 5th Grade

12 Qs

L3 - 7270/7290 - 457 Diagnose - Rectify Veh Aux Elec Faults

L3 - 7270/7290 - 457 Diagnose - Rectify Veh Aux Elec Faults

3rd Grade

15 Qs

Basic Engine Construction

Basic Engine Construction

1st - 4th Grade

20 Qs

L3 - 7270/7290 - 158 Diagnose - Rectify Chassis Faults

L3 - 7270/7290 - 158 Diagnose - Rectify Chassis Faults

3rd Grade

13 Qs

Task Electrical

Task Electrical

1st - 5th Grade

20 Qs

Soal Latihan Sensor

Soal Latihan Sensor

3rd Grade

16 Qs

Sistem pelumasan dan Sistem bahan bakar konvensioal

Sistem pelumasan dan Sistem bahan bakar konvensioal

1st - 3rd Grade

15 Qs

Online Quiz II : Subsea Oil and Gas Pipeline Design

Online Quiz II : Subsea Oil and Gas Pipeline Design

1st - 3rd Grade

20 Qs

Distribution #2

Distribution #2

Assessment

Quiz

Instructional Technology

3rd Grade

Medium

Created by

Jamie Boland

Used 2+ times

FREE Resource

17 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does SW stand for?

Switch

South west

Super wicked

Switch wand

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is an Induced voltage test?

a low voltage test

a high voltage across a winding with the other windings open-circuited

a resistance test

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why do we perform polarity test on transformers?

to connect the same polarity windings together both in primary and secondary

to check the voltage

to check the resistance of primary winding only

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why do we perform transformer winding resistance measurements?

to check for gross differences between windings and for openings in the connections

to check for continuity

to check the resistance of the windings

I have no idea

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

There are three main things which to be checked on a power transformer on a daily basis, True or false?

True

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what does OLTC stand for?

on-load tap changer

off-load tap changer

online tap converter

on-load tap connections

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

lnspection of Buchholz relays to be carried out when?

yearly

monthly

weekly

daily

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?