Chapter 02 2021 UPC

Chapter 02 2021 UPC

63 Qs

quiz-placeholder

Similar activities

中二歷史EXAM2史識測驗

中二歷史EXAM2史識測驗

7th Grade

67 Qs

Keberagaman masyarakat indonesia

Keberagaman masyarakat indonesia

9th Grade

65 Qs

Unit 3.1 Test

Unit 3.1 Test

11th Grade

64 Qs

LBS ENTRANCE MOCKTEST

LBS ENTRANCE MOCKTEST

University

64 Qs

GTH QUIZIZZ  UND 1, 2 Y 3  EVALUACIÓN UND 3  LA SEGURIDAD SOCIAL

GTH QUIZIZZ UND 1, 2 Y 3 EVALUACIÓN UND 3 LA SEGURIDAD SOCIAL

KG - University

68 Qs

 BÀI TẬP BÀI 43 MINNA

BÀI TẬP BÀI 43 MINNA

KG - University

62 Qs

2023-2024 Life Science Final Exam

2023-2024 Life Science Final Exam

6th - 8th Grade

63 Qs

Chapter 02 2021 UPC

Chapter 02 2021 UPC

Assessment

Quiz

others

Medium

Created by

Jeremy Sandor

Used 57+ times

FREE Resource

63 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A physical separation that may be a low inlet into the indirect waste receptor from the fixtures, appliances, or devices indirectly connected is the definition for an ______?
a. air break
b. air gap
c. indirect waste
d. individual vent

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image
Select the word or term that fits the sketch.
a. air gap
b. airbrake
c. overflow rim
d. static head

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The organization, office, or individual responsible for enforcing the requirements of a code or standard is the _________________________.
a. administrative authority
b. building department
c. plumbing inspector or department
d. Authority Having Jurisdiction

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fixture connections that require the removal of an access panel for servicing are considered _______.
a. accessible
b. readily accessible
c. not accessible
d. exposed

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

That part of the lowest piping of a drainage system that receives the discharge from soil, waste, and other drainage pipes inside the walls of the building and conveys it to a point 2 feet outside the building wall is a _____.
a. building drain
b. building sewer
c. waste pipe
d. soil stack

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

That portion of a drainage system that does not drain by gravity into the building sewer is known as a _____.
a. building supply
b. building subdrain
c. sewer ejector
d. storm sewer

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A horizontal drain that is sized to provide free movement of air above the flow line of the drain is called a _____.
a. continuous waste system
b. durham waste and vent system
c. combination waste and vent system
d. solvent waste and vent system

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?