Chapter 02 2021 UPC

Chapter 02 2021 UPC

63 Qs

quiz-placeholder

Similar activities

7.1 2 rotation and gravity GAME QUESTIONS

7.1 2 rotation and gravity GAME QUESTIONS

9th - 12th Grade

61 Qs

1(B) Auto II Final Assessment

1(B) Auto II Final Assessment

KG - University

60 Qs

SOAL HK DAN LAUNDRY KELAS XI HTL 1 dan 2

SOAL HK DAN LAUNDRY KELAS XI HTL 1 dan 2

KG - University

60 Qs

Canada, Mexico & Central America Test

Canada, Mexico & Central America Test

7th Grade

58 Qs

ASAS IPAS   KELAS VI HEBIST

ASAS IPAS KELAS VI HEBIST

KG - University

63 Qs

0653 - MCQ Revision - ELECTRICAL QUANTITIES AND ELECTRIC CIRCUITS

0653 - MCQ Revision - ELECTRICAL QUANTITIES AND ELECTRIC CIRCUITS

KG - University

62 Qs

Test Unit 3 - 1 A

Test Unit 3 - 1 A

9th Grade - University

60 Qs

Chapter 02 2021 UPC

Chapter 02 2021 UPC

Assessment

Quiz

others

Easy

Created by

Jeremy Sandor

Used 80+ times

FREE Resource

63 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A physical separation that may be a low inlet into the indirect waste receptor from the fixtures, appliances, or devices indirectly connected is the definition for an ______?

a. air break
b. air gap
c. indirect waste
d. individual vent

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Select the word or term that fits the sketch.

a. air gap
b. airbrake
c. overflow rim
d. static head

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The organization, office, or individual responsible for enforcing the requirements of a code or standard is the _________________________.

a. administrative authority
b. building department
c. plumbing inspector or department
d. Authority Having Jurisdiction

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fixture connections that require the removal of an access panel for servicing are considered _______.

a. accessible
b. readily accessible
c. not accessible
d. exposed

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

That part of the lowest piping of a drainage system that receives the discharge from soil, waste, and other drainage pipes inside the walls of the building and conveys it to a point 2 feet outside the building wall is a _____.

a. building drain
b. building sewer
c. waste pipe
d. soil stack

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

That portion of a drainage system that does not drain by gravity into the building sewer is known as a _____.

a. building supply
b. building subdrain
c. sewer ejector
d. storm sewer

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A horizontal drain that is sized to provide free movement of air above the flow line of the drain is called a _____.

a. continuous waste system
b. durham waste and vent system
c. combination waste and vent system
d. solvent waste and vent system

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?