Chapter 03 2021 UPC

Chapter 03 2021 UPC

43 Qs

quiz-placeholder

Similar activities

USBK Kimia

USBK Kimia

KG - University

42 Qs

 BÀI TẬP BÀI 42 MINNA

BÀI TẬP BÀI 42 MINNA

KG - University

45 Qs

Articles

Articles

KG - University

40 Qs

MTK XI / TKJ A - SAS Ganjil 2023 SMK MUHIPA

MTK XI / TKJ A - SAS Ganjil 2023 SMK MUHIPA

KG - University

40 Qs

Unit 7 REVIEW: Climate Change and Natural Resources

Unit 7 REVIEW: Climate Change and Natural Resources

9th Grade - University

40 Qs

DNA, Protein Synthesis, and Mutations Practice

DNA, Protein Synthesis, and Mutations Practice

KG - University

38 Qs

BIOLOGI TINGKATAN 4 PSPT

BIOLOGI TINGKATAN 4 PSPT

KG - University

41 Qs

Maestro João Carlos Martins 2024 8 ano 4 Bimestre

Maestro João Carlos Martins 2024 8 ano 4 Bimestre

8th Grade

40 Qs

Chapter 03 2021 UPC

Chapter 03 2021 UPC

Assessment

Quiz

others

Easy

Created by

Jeremy Sandor

Used 57+ times

FREE Resource

43 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. AIl materials, fixtures, or devices used or entering into the construction of plumbing and drainage systems shall be listed as
a. complying with approved applicable standards
b. conforming to green product specifications
c. conforming to price of job
d. conforming to material availability

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2. All pipe, pipe fittings, traps, fixtures, materials, and devices used in plumbing systems shall be____________________.
a. listed or labeled by a listing agency
b. approved by the Authority Having Jurisdiction
c. free from defects
d. all of the above

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3. The provisions of the code allow an alternate material or method of construction provided it is ________________________.
a. approved by the architect as an alternate
b. accepted by the owner as an alternate
c. approved by the Authority Having Jurisdiction as an alternate
d. manufactured by a reputable organization

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4. If an AHJ permits an “alternative engineered design” ______________________
a. the approval shall have effect beyond that AHJ boundary.
b. the approval shall have no effect beyond that AHJ boundary.
c. a property owner shall also approve the change.
d. a covenant shall be recorded to that effect.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

5. The section of the UPC that grants the Authority Having Jurisdiction the opportunity to require tests as proof of equivalency.
a. 301.3.1
b. 301.1.3
c. 311.3
d. 301.1.2

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6. Plumbing systems shall be located above the design flood elevation __________________
a. under no circumstances.
b. unless approved as a buoyancy compliant system.
c. except when designed to prevent water from entering or accumulating within components.
d. if they contain backwater valves.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

7. l.P.S. is the abbreviation for __________________.
a. iron pipe standard
b. iron pipe size
c. inside pipe standard
d. inside pipe size

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?