Chapter 11 2021 UPC

Chapter 11 2021 UPC

Professional Development

26 Qs

quiz-placeholder

Similar activities

Shop Safety

Shop Safety

Professional Development

21 Qs

Geography of Greece

Geography of Greece

Professional Development

24 Qs

Quiz về xe BYD tại Việt Nam

Quiz về xe BYD tại Việt Nam

Professional Development

26 Qs

SOSTENIBILITAT UT2

SOSTENIBILITAT UT2

Professional Development

27 Qs

OISD 105 Awareness Quiz

OISD 105 Awareness Quiz

Professional Development

30 Qs

Chapter 11 2021 UPC

Chapter 11 2021 UPC

Assessment

Quiz

others

Professional Development

Practice Problem

Medium

Created by

Jeremy Sandor

Used 40+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

26 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. Of those listed, roofs, inner courts, vent shafts, light wells, or similar areas having rainwater drains shall discharge to (a) _____.

a. sanitary sewage system
b. private sewage disposal system
c. sump with pump discharge into the house drain
d. outside of the building or to the gutter

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2. Storm water shall not be drained into sewers intended for _______________________________.

a. a combined sewer system
b. sanitary drainage only
c. a storm drain system
d. a storm sewer system

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3. Of those listed, an approved material for conductors installed above ground level in buildings is _____.

a. aluminum sheet metal
b. ABS Schedule 40
c. PVC SDR 35
d. CPVC

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4. The perimeter of buildings having basements, cellars, or crawl spaces or floors below grade shall be provided with _______________________.

a. backwater valves
b. seepage pits
c. subsoil drains
d. leach lines

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

5. Subsoil drain lines shall be _____________.

a. open jointed
b. perforated pipe
c. close jointed
d. open jointed or perforated pipe

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6. Subsoil drains shall be piped to a _______________________.

a. storm drain
b. street curb
c. alley

d. all of these answers

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

7. Roof drains, gutters, vertical conductors or leaders, and horizontal storm drains for primary drainage shall be sized based on _____.

a. 30-minute 30-year storm
b. 3 inches per hour
c. 60-minute 100-year return period
d. 6 inches per hour

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?