
Transportation Engineering Definition (Page 2)
Authored by Louie Angelo Saguran
Architecture
University
Used 1+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
22 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
a segment of a circle (an arc) usually laid out in a field by the tangent to a curve.
curing
Circular curves
compound curve
clapotis
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
the pressure against a vertical wall due to the waves.
clapotis
concrete
cut or excavation
delay
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
refers to any material that consists of aggregate, such as sand, gravel and stones.
cross slope
cement
concrete
construction joint
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
these result when two curves of differing radius join one another.
compound curve
crossing conflict
construction joint
cost of borrow
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
joints provided in concrete cement like a separation to allow building components to move with respect to one another.
block cracking
continuously reinforced concrete pavement
cross slope
construction joint
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
a rigid pavement which has no traverse joint, except construction joint and expansion joint. (Note: Traverse - across or through)
continuously reinforced concrete pavement
contraction joint
expansion joint
crossing conflict
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
this is the cost of any material that has to be obtained in order to make a fill.
cross slope
clapotis
circular curve
cost of borrow
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?