Transportation Engineering Definition (Page 2)

Transportation Engineering Definition (Page 2)

University

22 Qs

quiz-placeholder

Similar activities

AAR551 POP QUIZ

AAR551 POP QUIZ

University

20 Qs

Quiz- MT- 03

Quiz- MT- 03

University

25 Qs

TROPDES UE 2BP

TROPDES UE 2BP

University

20 Qs

B.TECH., B.UTIL 2

B.TECH., B.UTIL 2

University

20 Qs

Roof Finishes

Roof Finishes

University

20 Qs

ALE 2022_BLDG. TECH - MATERIALS OF CONSTRUCTION

ALE 2022_BLDG. TECH - MATERIALS OF CONSTRUCTION

University

17 Qs

BT5 Quiz - 4104

BT5 Quiz - 4104

University

20 Qs

Scaffolding and Formwork

Scaffolding and Formwork

University

19 Qs

Transportation Engineering Definition (Page 2)

Transportation Engineering Definition (Page 2)

Assessment

Quiz

Architecture

University

Easy

Created by

Louie Angelo Saguran

Used 1+ times

FREE Resource

22 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

a segment of a circle (an arc) usually laid out in a field by the tangent to a curve.

curing

Circular curves

compound curve

clapotis

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

the pressure against a vertical wall due to the waves.

clapotis

concrete

cut or excavation

delay

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

refers to any material that consists of aggregate, such as sand, gravel and stones.

cross slope

cement

concrete

construction joint

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

these result when two curves of differing radius join one another.

compound curve

crossing conflict

construction joint

cost of borrow

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

joints provided in concrete cement like a separation to allow building components to move with respect to one another.

block cracking

continuously reinforced concrete pavement

cross slope

construction joint

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

a rigid pavement which has no traverse joint, except construction joint and expansion joint. (Note: Traverse - across or through)

continuously reinforced concrete pavement

contraction joint

expansion joint

crossing conflict

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

this is the cost of any material that has to be obtained in order to make a fill.

cross slope

clapotis

circular curve

cost of borrow

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?