Work Design-Measurement-Batch-Production

Work Design-Measurement-Batch-Production

Professional Development

33 Qs

quiz-placeholder

Similar activities

Team_Building_Quiz_July

Team_Building_Quiz_July

Professional Development

28 Qs

Christmas Quiz

Christmas Quiz

Professional Development

28 Qs

Harry Potter Quiz

Harry Potter Quiz

2nd Grade - Professional Development

28 Qs

Airplanes

Airplanes

3rd Grade - Professional Development

37 Qs

Olympics 2020 Quiz

Olympics 2020 Quiz

6th Grade - Professional Development

30 Qs

Olympics 2012

Olympics 2012

KG - Professional Development

28 Qs

Disney Channel Shows

Disney Channel Shows

5th Grade - Professional Development

36 Qs

Harry Potter

Harry Potter

KG - Professional Development

28 Qs

Work Design-Measurement-Batch-Production

Work Design-Measurement-Batch-Production

Assessment

Quiz

Fun

Professional Development

Practice Problem

Easy

Created by

Khaled .jjbhh

Used 5+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

33 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The amount of time that should be allowed for an average worker to process one work unit using the standard method and working at a normal pace

Allowance time

Standard time

Normal time

Average time

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Normal time is calculated after adding an allowance time for the worker

True

False

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Standard time

Is a time taken to preform a work cycle at 100% performance

To account for the rest breaks, an allowance is added to the normal time in order to determine an allowance time for the worker to perform the task through out the shift

Process preformed without the direct participation of a human worker

The extra time figures which are added to the basic time of an operation to account for personal desires

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Normal time

Is a time taken to preform a work cycle at 100% performance

To account for the rest breaks, an allowance is added to the normal time in order to determine an allowance time for the worker to perform the task through out the shift

Process preformed without the direct participation of a human worker

The extra time figures which are added to the basic time of an operation to account for personal desires

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Allowance time

Is a time taken to preform a work cycle at 100% performance

To account for the rest breaks, an allowance is added to the normal time in order to determine an allowance time for the worker to perform the task through out the shift

Process preformed without the direct participation of a human worker

The extra time figures which are added to the basic time of an operation to account for personal desires

6.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Standard time eq

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Manual work system

Process performed without the direct participation of a human worker

Human worker operates provided equipment

Worker performing one or more tasks without the aid of powered tools

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?