Search Header Logo

TINTAGEL BRIDGE (DAY 4)

Authored by Myriam Grenier

Education

4th Grade

Used 1+ times

TINTAGEL BRIDGE (DAY 4)
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

10 mins • 1 pt

How long ago did a part of land collapse and separated the site into two parts ?

more than 500 years ago

4 years ago

15 centuries ago (in the 6th century)

2.

MULTIPLE CHOICE QUESTION

10 mins • 1 pt

How many visitors are there each year ?

Two thousand five hundred visitors

Five hundred thousand visitors

Two hundred and fifty thousand visitors

Fifty thousand and two hundred visitors

3.

MULTIPLE CHOICE QUESTION

10 mins • 1 pt

When was the construction of the bridge finished ?

In 2019

In 1500

In the 6th century

4.

MULTIPLE CHOICE QUESTION

10 mins • 1 pt

How long is the bridge ? (1 metre = 1,09361 yard)

76,5529 yards

54,6807 yards

65,6168 yards

5.

MULTIPLE CHOICE QUESTION

10 mins • 1 pt

How high is the bridge ?

5 metres

60 metres

250 000 metres

6.

MULTIPLE CHOICE QUESTION

10 mins • 1 pt

How much did the bridge cost ?

5 millions pounds

5 millions dollars

5 millions euros

7.

MATCH QUESTION

10 mins • 1 pt

What is the bridge made of ?

Oak

Media Image

Slate

Media Image

Steel

Media Image

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?