Search Header Logo

LC480 Service Training Day2 Review

Authored by John Lu

Education

Professional Development

Used 2+ times

LC480 Service Training Day2 Review
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which module is responsible for the acquisition of the plate fluorescence?

The thermal cycler (block cycler).

The detection unit (optical system).                

The control unit

RT-CPU

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What actions need to be done after exchanging the Xenon Bulb?

There are no special recommendations

change in the service SW the SN of the bulb.

Reset manually the hours counter.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The LED lifetime expectancy is 500-1'000 hours.

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which spare parts are needed to upgrade an analyzer to LED? Select all that apply.

DETECTION UNIT COMPLETE IV.

KIT UPGRADE LED.

LIGHT SOURCE 2.1 ASSY.

PCB LED CONTROL RELAX.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the Tool TTQ96?

Verify the temperature accuracy and homogeneity of the Block.

Replace IQ/OQ

Measure Fluorescence

Check the loading unit functionality.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which position should the switch always have in the RT CPU?

Middle

Left

There is no switch

Right

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which plates are detected by the MWP type sensor? Choose all that apply.

96 White plate.

384 white plate

96 clear plate

384 clear plate

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?