Central Heating 6035-02 | Part 1

Central Heating 6035-02 | Part 1

Professional Development

40 Qs

quiz-placeholder

Similar activities

HVAC FINAL

HVAC FINAL

Professional Development

40 Qs

Fitter 4th sem Module 3 Hydraulic and Pneumatics_1

Fitter 4th sem Module 3 Hydraulic and Pneumatics_1

Professional Development

41 Qs

IFGC & IMC 1

IFGC & IMC 1

Professional Development

40 Qs

Central Heating 6035-02 | Part 6

Central Heating 6035-02 | Part 6

Professional Development

40 Qs

Central Heating 6035-02 | Part 3

Central Heating 6035-02 | Part 3

Professional Development

40 Qs

Domestic Hot Water 6035-02 | Part 3

Domestic Hot Water 6035-02 | Part 3

Professional Development

40 Qs

MACHINE TROUBLESHOOTING D155A-6

MACHINE TROUBLESHOOTING D155A-6

Professional Development

35 Qs

Drainage Systems 6035-02 | Part 4

Drainage Systems 6035-02 | Part 4

Professional Development

36 Qs

Central Heating 6035-02 | Part 1

Central Heating 6035-02 | Part 1

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

George Harding

Used 181+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What British standard covers the design of water based heating systems?

BS 8000

BS EN 12828

BS 4422

BS EN 14336

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does "CHeSS" stand for?

Central Heating Efficiency System Specification

Controlling Heating effectively Standard Society

Central Heating Economically Sites Specification

Control of Heating Effectively Solar Saving

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is not a type of towel rail design?

Inverted

Conventional tubular

Designer

One-pipe

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

BS 1192 recognises the symbol shown here as?

Drain off valve

Double check valve

Automatic air vent

Radiator valve

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The neutral point of the system is at the base of the cold feed, where it joins the system, which sequence is correct?

Vent pipe-> Cold feed -> Pump

Pump -> Cold feed -> Vent pipe

Vent pipe -> Pump -> Cold feed

Cold feed -> Pump -> Vent pipe

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is used with medium low carbon steel pipes?

Steam and fire systems

Heating and oil lines

Gas

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the 'C plan plus two pipe semi gravity system' have additionally to that of a 'C plan two pipe semi gravity system'?

A room thermostat is installed on the system

Thermostatic radiator valves are installed

Additional zone controls on the system for heating

All of the above

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?