Search Header Logo

PROF PRAC 1

Authored by Jemimah Luna

Architecture

Professional Development

Used 6+ times

PROF PRAC 1
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following does NOT belong to composition of a Temporary Facility?

Signage

Warehouse

Bankhouse

Worker's Canteen

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Refers to the number of worker, lesser the worker when construction is almost finished.

Quantity

Quality

Queue

Quail

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The architect as a project manager is compensated what percentage of the project cost?

2%-5%

1%-1.5%

2.5%

7%

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Prepares the Shop drawings

Architect

Engineer

Contractor

Batman

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Price given by the contractor, sub-contractor, supplier and the like.

Specifications

Bid documents

Quotations

NOTA

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An outline specification enumerating the type of materials to be used?

Specifications

Schedule of materials and finishes

Construction drawings

Pre-feasibility studies

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

______ is a right enforceable against specific property to secure payment of obligation.

Ownership

Liens

Decree

Payment

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?