Communication 210

Communication 210

12th Grade

20 Qs

quiz-placeholder

Similar activities

Plumbing Systems Quiz

Plumbing Systems Quiz

11th Grade - University

20 Qs

DeBakey HSHP Integrity Month |Module 1: Intro

DeBakey HSHP Integrity Month |Module 1: Intro

9th - 12th Grade

18 Qs

Quiz

Quiz

8th Grade - University

20 Qs

Practical Research 2

Practical Research 2

12th Grade

15 Qs

Module 8: State and Non-state Institutions

Module 8: State and Non-state Institutions

11th Grade - University

20 Qs

Vocabulary 2.01-2.02

Vocabulary 2.01-2.02

9th - 12th Grade

15 Qs

W11 Mechanical and Electrical Services in Building Construction

W11 Mechanical and Electrical Services in Building Construction

12th Grade - University

15 Qs

Graphic Design with Illustrator & Photo Shop

Graphic Design with Illustrator & Photo Shop

9th - 12th Grade

20 Qs

Communication 210

Communication 210

Assessment

Quiz

Education

12th Grade

Easy

Created by

Paula Blanchard

Used 58+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a customer has a special learning difficulty which one of the following should you do?

Call your boss

Refer them to another company

Keep information short and relevant

Return later when someone else is there

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following would be employed by the main contractor on site?

Subcontractor

Building control officer

Clerk of works

Architect

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When installing an appliance, which document would you reference for the installation instructions?

The Electrical At Work Regulations

BS7671

Manufacturer's instructions

Works programme

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following documents offers guidance but is not legally enforceable?

Manufacturer's instructions

Building Regulations

Act of Parliament

Contract of employment

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A building control officer (BCO) commonly works for:

The main contractor

The local authority

The client

The architect

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The document that is handed to the customer, detailing the work to be done and a price is called:

An invoice

A Quotation

An estimate

Statutory cancellation rights

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The document that an operative submits, detailing the number of hours worked is:

A delivery note

A timesheet

A specification

A quotation

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?