How many hectares is the Changi East development area?

a) 1800 hectares

b) 1000 hectares

c) 1080 hectares

d) 1008 hectares

Answer explanation

The entire Changi East development area is 1080 hectares while the original Changi Airport is 1300 hectares.

2.

MULTIPLE CHOICE QUESTION

30 sec • 20 pts

Media Image

The concrete batching plant is used to produce ready-mix concrete onsite. What is the concrete mixture made up of?

a) Cement, sand and water

b) Cement, mud and aggregate

c) Cement, water and steel

d) Cement, asphalt and water

3.

MULTIPLE CHOICE QUESTION

30 sec • 20 pts

Media Image

Which of the following is the top layer found in the pavement for Cross-Field Taxiways?

Subgrade

GGAB (Ground Granular Aggregate Base)

CTB (Cement Treated Base)

HMAC (High Modulus Asphalt Concrete)

4.

MULTIPLE CHOICE QUESTION

30 sec • 20 pts

Media Image

What is the return period of rainfall ARC is designed to cater for?

a) 1-in-25 years

b) 1-in-50 years

c) 1-in-100 years

d) 1-in-200 years

Answer explanation

ARC is designed to cater for heavy rainfall of 1-in-100 years return period.

5.

MULTIPLE CHOICE QUESTION

30 sec • 20 pts

Media Image

Which of the following statement about ITBT is incorrect?

ITBT connects future T5 to T2.

The ITBT project is undertaken by LTA

Tunnel boring machine is used for the tunneling work

These ITBT tunnels will house the future BHS and APM systems

6.

MULTIPLE CHOICE QUESTION

30 sec • 20 pts

Media Image

What's the name of this structure in picture?

Landside Control Centre

Changi East Control Centre

CG2 Gate

CE Checkpoint

7.

MULTIPLE CHOICE QUESTION

30 sec • 20 pts

Construction for T5 ____________ will commence in 2 years.

a) satellite

b) airfield

c) terminal building

d) substructure

8.

MULTIPLE CHOICE QUESTION

30 sec • 20 pts

Media Image

When will T5 be operational?

a) Late-2020s

b) Early-2030s

c) Mid-2030s

d) Late-2030s

Answer explanation

Media Image

T5 will be operational around the mid-2030s.